Wind power plant · Throckmorton, TX
King Creek Wind Farm 2, LLC
King Creek Wind Farm 2, LLC is a 209 MW wind power plant in Throckmorton County, Texas, operated by King Creek Wind Farm 2, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 646 GWh, about what 48,000 average Texas homes use in a year.
King Creek Wind Farm 2, LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 78th largest, about 0.5% of the state's 45 GW of wind capacity.
Throckmorton County has 2 power plants of 1 MW or more with 679 MW in all; King Creek Wind Farm 2, LLC is 31% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Throckmorton County goes 16 hours a year without power, the 68th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
King Creek Wind Farm 2, LLC (outlined) and other plants in Throckmorton County, shaded. 33.182, -99.390.
Plant facts
- Operator
- King Creek Wind Farm 2, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Throckmorton County, TX
- EIA plant ID
- 66323
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| KC2 | Onshore Wind Turbine | 209 MW | 2022 | – |
Nearby
Other plants in Throckmorton County
Questions
King Creek Wind Farm 2, LLC, answered
How much power does King Creek Wind Farm 2, LLC produce?
King Creek Wind Farm 2, LLC has 209 MW of capacity from one generator. In 2025 it generated 646 GWh, 35% of the most it could have made running flat out all year (its capacity factor).
How many homes does King Creek Wind Farm 2, LLC power?
Its 2025 output of 646 GWh equals the yearly electricity use of about 48,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is King Creek Wind Farm 2, LLC?
King Creek Wind Farm 2, LLC is in Throckmorton County, Texas, at about 33.182°, -99.390°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Throckmorton County goes 16 hours a year without power, the 68th most of 240 counties in Texas. The county's page has the full outage record.
Who operates King Creek Wind Farm 2, LLC?
It is operated by King Creek Wind Farm 2, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did King Creek Wind Farm 2, LLC open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.