Solar power plant · Citrus, FL

Bay Trail Solar Power Plant

Bay Trail Solar Power Plant is a 75 MW solar power plant in Citrus County, Florida, operated by Duke Energy Florida, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 164 GWh, about what 12,000 average Florida homes use in a year.

Capacity75 MWNameplate, September 2026
Generated164 GWhIn 2025
Capacity factor25%Share of the most it could make, 2025
Generators1Oldest from 2022

Bay Trail Solar Power Plant in context

Among the 226 solar plants in Florida in the EIA's inventory, it is the 21st largest, about 0.5% of the state's 14 GW of solar capacity.

Citrus County has 2 power plants of 1 MW or more with 3.5 GW in all; Bay Trail Solar Power Plant is 2% of that.

Its capacity factor of 25% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Citrus County goes 7.3 hours a year without power, the 39th most of 67 counties in Florida. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0501001502002022202320242025GWh 164
0501001502002022202320242025164

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bay Trail Solar Power Plant (outlined) and other plants in Citrus County, shaded. 29.000, -82.672.

Plant facts

Operator
Duke Energy Florida, LLC
Sector
Electric Utility
Grid operator
FPC
County
Citrus County, FL
EIA plant ID
64145
Where Florida's power comes from → Florida power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 75 MW 2022 –

Nearby

Other plants in Citrus County

Questions

Bay Trail Solar Power Plant, answered

How much power does Bay Trail Solar Power Plant produce?

Bay Trail Solar Power Plant has 75 MW of capacity from one generator. In 2025 it generated 164 GWh, 25% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bay Trail Solar Power Plant power?

Its 2025 output of 164 GWh equals the yearly electricity use of about 12,000 average Florida homes (1,103 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bay Trail Solar Power Plant?

Bay Trail Solar Power Plant is in Citrus County, Florida, at about 29.000°, -82.672°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Citrus County goes 7.3 hours a year without power, the 39th most of 67 counties in Florida. The county's page has the full outage record.

Who operates Bay Trail Solar Power Plant?

It is operated by Duke Energy Florida, LLC (EIA sector: Electric Utility), and it feeds balancing authority FPC.

When did Bay Trail Solar Power Plant open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Florida home's 1,103 kWh a month in 2025. Methodology.