Wind power plant · Greenbrier, WV
Beech Ridge II Wind Energy Center
Beech Ridge II Wind Energy Center is a 56 MW wind power plant in Greenbrier County, West Virginia, operated by Southern Power Co. Its oldest generator still running came online in 2020. In 2025 it generated 127 GWh, about what 9,900 average West Virginia homes use in a year.
Beech Ridge II Wind Energy Center in context
Among the 8 wind plants in West Virginia in the EIA's inventory, it is the 7th largest, about 6.6% of the state's 856 MW of wind capacity.
Greenbrier County has 3 power plants of 1 MW or more with 188 MW in all; Beech Ridge II Wind Energy Center is 30% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Greenbrier County goes 17 hours a year without power, the 31st most of 55 counties in West Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Beech Ridge II Wind Energy Center (outlined) and other plants in Greenbrier County, shaded. 38.112, -80.613.
Plant facts
- Operator
- Southern Power Co
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Greenbrier County, WV
- EIA plant ID
- 62482
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 56 MW | 2020 | – |
Nearby
Other plants in Greenbrier County
Questions
Beech Ridge II Wind Energy Center, answered
How much power does Beech Ridge II Wind Energy Center produce?
Beech Ridge II Wind Energy Center has 56 MW of capacity from one generator. In 2025 it generated 127 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Beech Ridge II Wind Energy Center power?
Its 2025 output of 127 GWh equals the yearly electricity use of about 9,900 average West Virginia homes (1,073 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Beech Ridge II Wind Energy Center?
Beech Ridge II Wind Energy Center is in Greenbrier County, West Virginia, at about 38.112°, -80.613°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Greenbrier County goes 17 hours a year without power, the 31st most of 55 counties in West Virginia. The county's page has the full outage record.
Who operates Beech Ridge II Wind Energy Center?
It is operated by Southern Power Co (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Beech Ridge II Wind Energy Center open?
Its oldest generator still running came online in 2020.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average West Virginia home's 1,073 kWh a month in 2025. Methodology.