Where the power comes from · 2025
West Virginia
Coal made 87% of the electricity generated in West Virginia in 2025, the 1st highest coal share of any state. In 2005, coal made 98% of it; in 2025, 87%.
The mix
West Virginia's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
West Virginia's power plants
42 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in West Virginia, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
West Virginia's power plants emitted 869 kg of CO₂ for each MWh they generated in 2024, against 916 kg in 2005: the 51st lowest of 51. 44 million metric tons in all.
West Virginia among the states
- Generation53.4 TWh31st
- Renewable share7%44th
- Carbon-free share7%50th
- Cleanest electricity (kg CO₂/MWh, 2024)86951st
- Coal share87%1st
- Natural gas share6.2%46th
- Wind share3.7%25th
- Hydro share2.7%26th
More on West Virginia
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in West Virginia
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| John E Amos | Coal | Putnam | 2.9 GW | 9.1 TWh | 35% | 1971 |
| FirstEnergy Harrison Power Station | Coal | Harrison | 2.1 GW | 11 TWh | 60% | 1972 |
| Mt Storm | Coal | Grant | 1.7 GW | 4.3 TWh | 30% | 1965 |
| Mitchell (WV) | Coal | Marshall | 1.6 GW | 4.0 TWh | 28% | 1971 |
| Pleasants Power Station | Coal | Pleasants | 1.4 GW | 387 GWh | 3% | 1979 |
| Mountaineer | Coal | Mason | 1.3 GW | 6.9 TWh | 60% | 1980 |
| FirstEnergy Fort Martin Power Station | Coal | Monongalia | 1.2 GW | 6.1 TWh | 61% | 1967 |
| Longview Power Plant | Coal | Monongalia | 808 MW | 4.6 TWh | 66% | 2011 |
| Ceredo Generating Station | Natural gas | Wayne | 519 MW | 702 GWh | 15% | 2001 |
| Pleasants Energy LLC | Natural gas | Pleasants | 383 MW | 1.5 TWh | 46% | 2002 |
| Big Sandy Peaker Plant | Natural gas | Wayne | 353 MW | 330 GWh | 11% | 2001 |
| NedPower Mount Storm | Wind | Grant | 264 MW | 332 GWh | 14% | 2008 |
| BHER Ravenswood Solar 1 | Solar | Jackson | 192 MW | 0.3 GWh | – | 2025 |
| Axiall Natrium Plant | Natural gas | Marshall | 116 MW | 617 GWh | 61% | 1943 |
| Black Rock Wind | Wind | Mineral | 115 MW | 396 GWh | 39% | 2022 |
| New Creek Wind | Wind | Grant | 103 MW | 293 GWh | 32% | 2016 |
| Hawks Nest Hydro | Hydro | Fayette | 102 MW | 366 GWh | 41% | 1936 |
| Beech Ridge Energy LLC | Wind | Greenbrier | 101 MW | 269 GWh | 31% | 2010 |
| Laurel Mountain Hybrid | Wind | Barbour | 98 MW | 266 GWh | 31% | 2011 |
| Blake Solar Plant | Solar | Jefferson | 96 MW | 158 GWh | 19% | 2024 |
| Grant Town Power Plant | Coal | Marion | 96 MW | 409 GWh | 49% | 1992 |
| Gauley River Power Partners | Hydro | Nicholas | 80 MW | 149 GWh | 21% | 2001 |
| Morgantown Energy Facility | Coal | Monongalia | 69 MW | – | – | 1991 |
| Mountaineer Wind Energy Center | Wind | Tucker | 66 MW | 114 GWh | 20% | 2002 |
| Beech Ridge II Wind Energy Center | Wind | Greenbrier | 56 MW | 127 GWh | 26% | 2020 |
| Pinnacle Wind Force LLC | Wind | Mineral | 54 MW | 193 GWh | 41% | 2011 |
| Willow Island Hydroelectric Plant | Hydro | Pleasants | 44 MW | 198 GWh | 51% | 2016 |
| Belleville Dam | Hydro | Wood | 42 MW | 257 GWh | 70% | 1999 |
| New Martinsville Hannibal Hydro | Hydro | Wetzel | 37 MW | 195 GWh | 59% | 1988 |
| Beech Ridge Energy Storage | Storage | Greenbrier | 32 MW | -3.8 GWh | – | 2015 |
| Winfield | Hydro | Putnam | 25 MW | 93 GWh | 43% | 1938 |
| Capon Bridge Solar LLC | Solar | Hampshire | 20 MW | 34 GWh | 19% | 2024 |
| Fort Martin Solar | Solar | Monongalia | 19 MW | 25 GWh | 15% | 2024 |
| London | Hydro | Kanawha | 14 MW | 64 GWh | 51% | 1935 |
| Marmet | Hydro | Kanawha | 14 MW | 68 GWh | 54% | 1935 |
| Glen Ferris Hydro | Hydro | Fayette | 6.2 MW | 11 GWh | 20% | 1912 |
| Marlowe Solar | Solar | Berkeley | 5.8 MW | 7.8 GWh | – | 2025 |
| Rivesville Solar | Solar | Marion | 5.5 MW | 7.9 GWh | 16% | 2024 |
| New River Clean Energy | Biomass | Raleigh | 3.2 MW | 6.8 GWh | 24% | 2017 |
| Millville Hydro Station | Hydro | Jefferson | 2.8 MW | 7.7 GWh | 31% | 1913 |
| Dam No. 4 Hydro Station | Hydro | Jefferson | 1.9 MW | 8.1 GWh | 49% | 1909 |
| Dam No. 5 Hydro Station | Hydro | Berkeley | 1.0 MW | 6.5 GWh | 74% | 1919 |
Coming next
Planned projects
The largest generators reported as planned in West Virginia, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Wolf Summit Energy | Natural gas | Harrison | 372 MW | 2028 |
| Wolf Summit Energy | Natural gas | Harrison | 207 MW | 2028 |
| Parks Valley Energy LLC | Storage | Hampshire | 150 MW | 2027 |
| Rippon Energy Facility | Solar | Jefferson | 117 MW | 2028 |
| Bedington Energy Facility, LLC | Solar | Berkeley | 100 MW | 2028 |
| Mammoth | Solar | Kanawha | 86 MW | 2028 |
| Mammoth | Storage | Kanawha | 70 MW | 2029 |
| Davis Solar (WV) | Solar | Tucker | 12 MW | 2028 |
| Mammoth | Storage | Kanawha | 10 MW | 2029 |
| Tygart Hydropower | Hydro | Taylor | 10 MW | 2029 |
| Tygart Hydropower | Hydro | Taylor | 10 MW | 2029 |
| Tygart Hydropower | Hydro | Taylor | 10 MW | 2029 |
| New Cumberland Hydroelectric Project | Hydro | Hancock | 10 MW | 2029 |
| New Cumberland Hydroelectric Project | Hydro | Hancock | 10 MW | 2029 |
| Wylie Ridge Solar | Solar | Hancock | 8.4 MW | 2027 |
| R.C. Byrd L&D Hydroelectric Project | Hydro | Mason | 4.8 MW | 2029 |
| R.C. Byrd L&D Hydroelectric Project | Hydro | Mason | 4.8 MW | 2029 |
| R.C. Byrd L&D Hydroelectric Project | Hydro | Mason | 4.8 MW | 2029 |
| R.C. Byrd L&D Hydroelectric Project | Hydro | Mason | 4.8 MW | 2029 |
| R.C. Byrd L&D Hydroelectric Project | Hydro | Mason | 4.8 MW | 2029 |
| R.C. Byrd L&D Hydroelectric Project | Hydro | Mason | 4.8 MW | 2029 |
| Opekiska L&D Hydroelectric Project | Hydro | Monongalia | 3.0 MW | 2028 |
| Opekiska L&D Hydroelectric Project | Hydro | Monongalia | 3.0 MW | 2028 |
| Morgantown L&D Hydroelectric Project | Hydro | Monongalia | 2.5 MW | 2028 |
| Morgantown L&D Hydroelectric Project | Hydro | Monongalia | 2.5 MW | 2028 |
Shut down
Retired since 2010
The largest generators retired in West Virginia since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Philip Sporn | Coal | 496 MW | 2012 |
| Kammer | Coal | 238 MW | 2015 |
| Kammer | Coal | 238 MW | 2015 |
| Kammer | Coal | 238 MW | 2015 |
| Kanawha River | Coal | 220 MW | 2017 |
| Kanawha River | Coal | 220 MW | 2017 |
| FirstEnergy Willow Island | Coal | 163 MW | 2012 |
| Philip Sporn | Coal | 153 MW | 2015 |
| Philip Sporn | Coal | 153 MW | 2015 |
| Philip Sporn | Coal | 153 MW | 2015 |
| Philip Sporn | Coal | 153 MW | 2015 |
| FirstEnergy Albright | Coal | 140 MW | 2012 |
| North Branch (WV) | Coal | 80 MW | 2012 |
| FirstEnergy Rivesville | Coal | 75 MW | 2012 |
| FirstEnergy Albright | Coal | 69 MW | 2012 |
| FirstEnergy Albright | Coal | 69 MW | 2012 |
| FirstEnergy Willow Island | Coal | 50 MW | 2012 |
| Alloy Steam Station | Coal | 40 MW | 2011 |
| FirstEnergy Rivesville | Coal | 35 MW | 2012 |
| Laurel Mountain Hybrid | Storage | 16 MW | 2025 |
| Axiall Natrium Plant | Natural gas | 7.5 MW | 2018 |
| Bayer CropScience Institute Plant | Coal | 6.3 MW | 2015 |
| Bayer CropScience Institute Plant | Coal | 6.3 MW | 2015 |
| Union Carbide South Charleston | Natural gas | 6.0 MW | 2014 |
| AEP Milton NaS | Storage | 2.0 MW | 2021 |
| The Charleston Clean Energy Facility | Biomass | 1.1 MW | 2015 |
| The Charleston Clean Energy Facility | Biomass | 1.1 MW | 2015 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.