Natural gas power plant · Wayne, WV
Ceredo Generating Station
Ceredo Generating Station is a 519 MW natural gas power plant in Wayne County, West Virginia, operated by Appalachian Power Co. Its oldest generator still running came online in 2001. In 2025 it generated 702 GWh, about what 55,000 average West Virginia homes use in a year.
Ceredo Generating Station in context
Among the 4 natural gas plants in West Virginia in the EIA's inventory, it is the largest, about 38% of the state's 1.4 GW of natural gas capacity.
Wayne County has 2 power plants of 1 MW or more with 872 MW in all; Ceredo Generating Station is 59% of that and the largest of 2 natural gas plants there.
Its capacity factor of 15% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Wayne County goes 50 hours a year without power, the 3rd most of 55 counties in West Virginia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ceredo Generating Station (outlined) and other plants in Wayne County, shaded. 38.368, -82.534.
Plant facts
- Operator
- Appalachian Power Co
- Sector
- Electric Utility
- Grid operator
- PJM
- County
- Wayne County, WV
- EIA plant ID
- 55276
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 01 | Natural Gas Fired Combustion Turbine | 87 MW | 2001 | – |
| 02 | Natural Gas Fired Combustion Turbine | 87 MW | 2001 | – |
| 03 | Natural Gas Fired Combustion Turbine | 87 MW | 2001 | – |
| 04 | Natural Gas Fired Combustion Turbine | 87 MW | 2001 | – |
| 05 | Natural Gas Fired Combustion Turbine | 87 MW | 2001 | – |
| 06 | Natural Gas Fired Combustion Turbine | 87 MW | 2001 | – |
Nearby
Other plants in Wayne County
Questions
Ceredo Generating Station, answered
How much power does Ceredo Generating Station produce?
Ceredo Generating Station has 519 MW of capacity from 6 generators. In 2025 it generated 702 GWh, 15% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ceredo Generating Station power?
Its 2025 output of 702 GWh equals the yearly electricity use of about 55,000 average West Virginia homes (1,073 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ceredo Generating Station?
Ceredo Generating Station is in Wayne County, West Virginia, at about 38.368°, -82.534°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Wayne County goes 50 hours a year without power, the 3rd most of 55 counties in West Virginia. The county's page has the full outage record.
Who operates Ceredo Generating Station?
It is operated by Appalachian Power Co (EIA sector: Electric Utility), and it feeds PJM Interconnection.
When did Ceredo Generating Station open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average West Virginia home's 1,073 kWh a month in 2025. Methodology.