Oil power plant · Washington, VT
Berlin 5
Berlin 5 is a 42 MW oil power plant in Washington County, Vermont, operated by Green Mountain Power Corp. Its oldest generator still running came online in 1972. In 2025 it generated 1.4 GWh, about what 197 average Vermont homes use in a year.
Berlin 5 in context
Among the 9 other-fuel plants in Vermont in the EIA's inventory, it is the 3rd largest, about 18% of the state's 236 MW of other-fuel capacity.
Washington County has 7 power plants of 1 MW or more with 67 MW in all; Berlin 5 is 63% of that.
Its capacity factor of 0% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in Washington County goes 7.7 hours a year without power, the 8th most of 14 counties in Vermont. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Berlin 5 (outlined) and other plants in Washington County, shaded. 44.251, -72.603.
Plant facts
- Operator
- Green Mountain Power Corp
- Sector
- Electric Utility
- Grid operator
- ISNE
- County
- Washington County, VT
- EIA plant ID
- 3734
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GT1 | Petroleum Liquids | 42 MW | 1972 | – |
Nearby
Other plants in Washington County
Questions
Berlin 5, answered
How much power does Berlin 5 produce?
Berlin 5 has 42 MW of capacity from one generator. In 2025 it generated 1.4 GWh, 0% of the most it could have made running flat out all year (its capacity factor).
How many homes does Berlin 5 power?
Its 2025 output of 1.4 GWh equals the yearly electricity use of about 197 average Vermont homes (591 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Berlin 5?
Berlin 5 is in Washington County, Vermont, at about 44.251°, -72.603°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Washington County goes 7.7 hours a year without power, the 8th most of 14 counties in Vermont. The county's page has the full outage record.
Who operates Berlin 5?
It is operated by Green Mountain Power Corp (EIA sector: Electric Utility), and it feeds ISO New England.
When did Berlin 5 open?
Its oldest generator still running came online in 1972.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Vermont home's 591 kWh a month in 2025. Methodology.