Where the power comes from · 2025
Vermont
Hydro made 50% of the electricity generated in Vermont in 2025, the 2nd highest hydro share of any state.
The mix
Vermont's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Vermont's power plants
117 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Vermont, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Vermont's power plants emitted 4 kg of CO₂ for each MWh they generated in 2024, against 2 kg in 2005: the 1st lowest of 51. 10,000 metric tons in all.
Vermont among the states
- Generation2.0 TWh50th
- Renewable share100%1st
- Carbon-free share100%1st
- Cleanest electricity (kg CO₂/MWh, 2024)41st
- Hydro share50%2nd
- Other share21%3rd
- Wind share19%14th
- Solar share10%8th
Plants
The largest plants in Vermont
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Kingdom Community Wind | Wind | Orleans | 65 MW | 179 GWh | 32% | 2012 |
| J C McNeil | Biomass | Chittenden | 60 MW | 209 GWh | 40% | 1984 |
| VPPSA Project 10 | Oil | Franklin | 47 MW | 1.2 GWh | 0% | 2010 |
| Berlin 5 | Oil | Washington | 42 MW | 1.4 GWh | 0% | 1972 |
| Bellows Falls | Hydro | Windham | 41 MW | 194 GWh | 54% | 1928 |
| Sheffield Wind | Wind | Caledonia | 40 MW | 68 GWh | 19% | 2011 |
| Vernon Dam | Hydro | Windham | 36 MW | 120 GWh | 38% | 1909 |
| Wilder | Hydro | Windsor | 36 MW | 134 GWh | 43% | 1950 |
| Harriman | Hydro | Windham | 34 MW | 98 GWh | 33% | 1924 |
| Deerfield Wind LLC | Wind | Bennington | 30 MW | 97 GWh | 37% | 2017 |
| Burlington GT | Oil | Chittenden | 26 MW | 0.7 GWh | 0% | 1971 |
| Sheldon Springs Hydroelectric | Hydro | Franklin | 25 MW | 53 GWh | 24% | 1988 |
| Ryegate Associates, LLC | Biomass | Caledonia | 22 MW | 158 GWh | 84% | 1992 |
| Coolidge Solar 1, LLC | Solar | Windsor | 20 MW | 24 GWh | 14% | 2018 |
| Colchester 16 | Oil | Chittenden | 18 MW | 0.3 GWh | 0% | 1965 |
| Essex Junction 19 | Hydro | Chittenden | 16 MW | 34 GWh | 24% | 1917 |
| Ascutney | Oil | Windsor | 13 MW | 0.1 GWh | 0% | 1961 |
| Highgate Falls | Hydro | Franklin | 12 MW | 32 GWh | 32% | 1923 |
| Mcindoes | Hydro | Caledonia | 10 MW | 39 GWh | 43% | 1931 |
| Georgia Mountain Community Wind Farm | Wind | Chittenden | 10 MW | 29 GWh | 33% | 2012 |
| Bolton Falls | Hydro | Washington | 8.8 MW | 6.1 GWh | 8% | 1986 |
| Coventry Clean Energy Corporation | Biomass | Orleans | 8.0 MW | 57 GWh | 82% | 2005 |
| Chace Mill Winooski One | Hydro | Chittenden | 7.5 MW | 17 GWh | 26% | 1993 |
| Milton | Hydro | Chittenden | 7.4 MW | 34 GWh | 52% | 1929 |
| GMP Solar/Storage-Milton Hybrid | Solar | Chittenden | 7.0 MW | 7.1 GWh | 12% | 2019 |
| GMP Solar/Storage-Ferrisburgh Hybrid | Solar | Addison | 7.0 MW | 8.2 GWh | 13% | 2019 |
| Proctor | Hydro | Rutland | 6.9 MW | 28 GWh | 46% | 1905 |
| GMP Solar/Storage-Essex Hybrid | Solar | Chittenden | 6.5 MW | 6.7 GWh | 12% | 2019 |
| Peterson | Hydro | Chittenden | 6.3 MW | 25 GWh | 46% | 1948 |
| Searsburg Wind Turbine | Wind | Bennington | 6.0 MW | 12 GWh | 22% | 1997 |
| GMP Solar - Panton Hybrid | Solar | Addison | 5.9 MW | 8.7 GWh | 17% | 2016 |
| Beldens | Hydro | Addison | 5.7 MW | 6.0 GWh | 12% | 1913 |
| Huntington Falls | Hydro | Addison | 5.7 MW | 12 GWh | 24% | 1988 |
| Waterbury 22 | Hydro | Washington | 5.5 MW | 11 GWh | 24% | 1953 |
| Marshfield 6 | Hydro | Washington | 5.0 MW | 3.9 GWh | 9% | 1927 |
| GMP Solar - Hartford | Solar | Windsor | 5.0 MW | 7.0 GWh | 16% | 2016 |
| GMP Solar - Williamstown | Solar | Orange | 5.0 MW | 7.0 GWh | 16% | 2016 |
| Elizabeth Mines Solar 1 | Solar | Orange | 5.0 MW | 6.7 GWh | 15% | 2017 |
| South Street - Middlebury | Solar | Addison | 5.0 MW | 9.0 GWh | 21% | 2023 |
| Georgia Ballard BESS | Storage | Franklin | 5.0 MW | -0.6 GWh | – | 2023 |
| Springfield BESS | Storage | Windsor | 5.0 MW | -0.7 GWh | – | 2023 |
| Brattleboro (Windham Landfill) | Solar | Windham | 5.0 MW | 6.1 GWh | 14% | 2018 |
| Saint Albans Solar | Solar | Franklin | 4.9 MW | 7.3 GWh | 17% | 2018 |
| Gilman Mill | Hydro | Essex | 4.8 MW | 2.2 GWh | 5% | 1941 |
| GMP Solar - Williston | Solar | Chittenden | 4.7 MW | 6.2 GWh | 15% | 2016 |
| Newport | Hydro | Orleans | 4.0 MW | 13 GWh | 37% | 1936 |
| Searsburg | Hydro | Bennington | 4.0 MW | 16 GWh | 45% | 1922 |
| Stafford Hill Solar Hybrid | Storage | Rutland | 4.0 MW | 0.6 GWh | – | 2015 |
| Pittsford | Hydro | Rutland | 3.6 MW | 7.5 GWh | 24% | 1914 |
| Fairfax Falls | Hydro | Franklin | 3.5 MW | 16 GWh | 53% | 1919 |
| Middlesex 2 | Hydro | Washington | 3.2 MW | 5.9 GWh | 21% | 1928 |
| Clark Falls | Hydro | Chittenden | 3.0 MW | 14 GWh | 54% | 1937 |
| Weybridge | Hydro | Addison | 3.0 MW | 9.7 GWh | 37% | 1951 |
| Gorge 18 | Hydro | Chittenden | 3.0 MW | 15 GWh | 59% | 1928 |
| Deweys Mill | Hydro | Windsor | 3.0 MW | 1.7 GWh | 7% | 1989 |
| Lower Middlebury | Hydro | Addison | 2.4 MW | 5.2 GWh | 25% | 1917 |
| Vergennes 9 | Hydro | Addison | 2.4 MW | 7.7 GWh | 37% | 1912 |
| Ball Mountain Hydro | Hydro | Windham | 2.4 MW | 1.0 GWh | 5% | 2016 |
| Sheldon Solar | Solar | Franklin | 2.3 MW | 2.1 GWh | 10% | 2013 |
| Cold River Road Solar | Solar | Rutland | 2.3 MW | 3.2 GWh | 16% | 2016 |
| East Barnet | Hydro | Caledonia | 2.2 MW | 4.7 GWh | 24% | 1984 |
| Silver Lake (VT) | Hydro | Addison | 2.2 MW | 5.2 GWh | 27% | 1917 |
| Chittenden County Solar Partners | Solar | Chittenden | 2.2 MW | 2.9 GWh | 15% | 2011 |
| Whitcomb Solar Farm | Solar | Chittenden | 2.2 MW | 3.0 GWh | 16% | 2014 |
| Claire Solar Farm | Solar | Chittenden | 2.2 MW | 4.1 GWh | 21% | 2014 |
| Chester Power Partners | Solar | Windsor | 2.2 MW | 2.4 GWh | 13% | 2014 |
| Coventry Photovoltaic, LLC | Solar | Orleans | 2.2 MW | 2.7 GWh | 14% | 2014 |
| Limerick Road Solar Farm | Solar | Chittenden | 2.2 MW | 3.0 GWh | 16% | 2013 |
| Next Generation Solar Farm | Solar | Addison | 2.2 MW | 3.6 GWh | 19% | 2017 |
| MHG Wallingford | Solar | Rutland | 2.2 MW | 3.5 GWh | 18% | 2019 |
| Battle Creek Solar | Solar | Bennington | 2.2 MW | 3.3 GWh | 17% | 2018 |
| Lawrence Brook | Solar | Lamoille | 2.2 MW | 3.0 GWh | 16% | 2020 |
| Golden Solar | Solar | Caledonia | 2.2 MW | 3.5 GWh | 18% | 2021 |
| MacKinnon Solar | Solar | Rutland | 2.2 MW | 3.4 GWh | 18% | 2021 |
| ER Sand Hill | Solar | Rutland | 2.2 MW | 3.4 GWh | 18% | 2022 |
| Gray Solar | Solar | Rutland | 2.2 MW | 3.4 GWh | 18% | 2023 |
| GSPP Gilman, LLC | Solar | Essex | 2.1 MW | 3.0 GWh | 16% | 2018 |
| ER Salvage Yard | Solar | Lamoille | 2.1 MW | 2.8 GWh | 15% | 2021 |
| ER Center Road Solar, LLC | Solar | Caledonia | 2.1 MW | 3.0 GWh | 16% | 2022 |
| Glen | Hydro | Rutland | 2.0 MW | 6.3 GWh | 36% | 1920 |
| SVEP Solar Project Company | Solar | Bennington | 2.0 MW | 1.6 GWh | 9% | 2012 |
| Williamstown Solar | Solar | Orange | 2.0 MW | 2.2 GWh | 13% | 2012 |
| Open View Solar Farm | Solar | Addison | 2.0 MW | 2.8 GWh | 16% | 2013 |
| Technology Drive Solar | Solar | Windham | 2.0 MW | 2.6 GWh | 15% | 2014 |
| St. Albans SPEED Project | Solar | Franklin | 2.0 MW | 2.0 GWh | 11% | 2013 |
| Clarendon Solar Farm | Solar | Rutland | 2.0 MW | 2.9 GWh | 17% | 2014 |
| Charlotte Solar LLC VT | Solar | Chittenden | 2.0 MW | 2.9 GWh | 17% | 2014 |
| Sudbury Solar | Solar | Rutland | 2.0 MW | 1.5 GWh | 9% | 2016 |
| Jericho Gravel Solar Farm | Solar | Chittenden | 2.0 MW | 2.3 GWh | 13% | 2021 |
| Jericho Landfill Solar Farm | Solar | Chittenden | 2.0 MW | 1.5 GWh | 9% | 2021 |
| Great Falls (VT) | Hydro | Caledonia | 1.9 MW | 1.9 GWh | 11% | 1915 |
| Barton Solar Farm | Solar | Orleans | 1.9 MW | 2.5 GWh | 15% | 2014 |
| GMP Solar - Richmond | Solar | Chittenden | 1.9 MW | 2.7 GWh | 16% | 2016 |
| Hinesburg | Storage | Chittenden | 1.9 MW | -0.3 GWh | – | 2019 |
| W K Sanders | Hydro | Lamoille | 1.8 MW | 0.6 GWh | 4% | 1983 |
| Morrisville | Hydro | Lamoille | 1.8 MW | 5.0 GWh | 32% | 1924 |
| Ottauquechee Hydro | Hydro | Windsor | 1.8 MW | 2.8 GWh | 18% | 1983 |
| SunGen Sharon 1 LLC | Solar | Windsor | 1.8 MW | 2.4 GWh | 15% | 2012 |
| Westminster | Solar | Windham | 1.8 MW | 2.5 GWh | 16% | 2016 |
| Park St | Solar | Rutland | 1.8 MW | 1.7 GWh | 11% | 2014 |
Coming next
Planned projects
The largest generators reported as planned in Vermont, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Panton | Solar | Addison | 50 MW | 2028 |
| Fair Haven Solar | Solar | Rutland | 20 MW | 2028 |
| Shaftsbury Solar | Solar | Bennington | 20 MW | 2028 |
| Essex VT BESS 1 | Storage | Chittenden | 16 MW | 2026 |
| Apple Hill Solar | Solar | Bennington | 2.0 MW | 2027 |
Shut down
Retired since 2010
The largest generators retired in Vermont since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Vermont Yankee | Nuclear | 563 MW | 2014 |
| Rutland | Oil | 13 MW | 2025 |
| Florence | Oil | 4.6 MW | 2013 |
| Florence | Oil | 4.6 MW | 2013 |
| Gilman Mill | Biomass | 4.0 MW | 2014 |
| Vergennes 9 | Oil | 2.0 MW | 2021 |
| Vergennes 9 | Oil | 2.0 MW | 2021 |
| Moretown | Biomass | 1.6 MW | 2023 |
| Moretown | Biomass | 1.6 MW | 2017 |
| West Charleston | Oil | 1.4 MW | 2013 |
| West Charleston | Oil | 1.4 MW | 2013 |
| Middlebury College | Biomass | 0.2 MW | 2011 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.