Hydro power plant · Caledonia, VT
Mcindoes
Mcindoes is a 10 MW hydro power plant in Caledonia County, Vermont, operated by Great River Hydro, LLC. Its oldest generator still running came online in 1931. In 2025 it generated 39 GWh, about what 5,500 average Vermont homes use in a year.
Mcindoes in context
Among the 46 hydro plants in Vermont in the EIA's inventory, it is the 8th largest, about 3.1% of the state's 336 MW of hydro capacity.
Caledonia County has 9 power plants of 1 MW or more with 83 MW in all; Mcindoes is 13% of that and the largest of 4 hydro plants there.
Its capacity factor of 43% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Caledonia County goes 7.3 hours a year without power, the 10th most of 14 counties in Vermont. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mcindoes (outlined) and other plants in Caledonia County, shaded. 44.260, -72.059.
Plant facts
- Operator
- Great River Hydro, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Caledonia County, VT
- EIA plant ID
- 6483
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | 2.6 MW | 1931 | – |
| GEN2 | Conventional Hydroelectric | 2.6 MW | 1931 | – |
| GEN3 | Conventional Hydroelectric | 2.6 MW | 1931 | – |
| GEN4 | Conventional Hydroelectric | 2.6 MW | 1931 | – |
Nearby
Other plants in Caledonia County
Questions
Mcindoes, answered
How much power does Mcindoes produce?
Mcindoes has 10 MW of capacity from 4 generators. In 2025 it generated 39 GWh, 43% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mcindoes power?
Its 2025 output of 39 GWh equals the yearly electricity use of about 5,500 average Vermont homes (591 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mcindoes?
Mcindoes is in Caledonia County, Vermont, at about 44.260°, -72.059°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Caledonia County goes 7.3 hours a year without power, the 10th most of 14 counties in Vermont. The county's page has the full outage record.
Who operates Mcindoes?
It is operated by Great River Hydro, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Mcindoes open?
Its oldest generator still running came online in 1931.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Vermont home's 591 kWh a month in 2025. Methodology.