Biomass power plant · Chittenden, VT
J C McNeil
J C McNeil is a 60 MW biomass power plant in Chittenden County, Vermont, operated by City of Burlington Electric - (VT). Its oldest generator still running came online in 1984. In 2025 it generated 209 GWh, about what 30,000 average Vermont homes use in a year.
J C McNeil in context
Among the 9 other-fuel plants in Vermont in the EIA's inventory, it is the largest, about 25% of the state's 236 MW of other-fuel capacity.
Chittenden County has 24 power plants of 1 MW or more with 196 MW in all; J C McNeil is 30% of that and the largest of 3 biomass plants there.
Its capacity factor of 40% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Chittenden County goes 2.3 hours a year without power, the 14th most of 14 counties in Vermont. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
J C McNeil (outlined) and other plants in Chittenden County, shaded. 44.492, -73.208.
Plant facts
- Operator
- City of Burlington Electric - (VT)
- Sector
- Electric Utility
- Grid operator
- ISNE
- County
- Chittenden County, VT
- EIA plant ID
- 589
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Wood/Wood Waste Biomass | 60 MW | 1984 | – |
Nearby
Other plants in Chittenden County
Questions
J C McNeil, answered
How much power does J C McNeil produce?
J C McNeil has 60 MW of capacity from one generator. In 2025 it generated 209 GWh, 40% of the most it could have made running flat out all year (its capacity factor).
How many homes does J C McNeil power?
Its 2025 output of 209 GWh equals the yearly electricity use of about 30,000 average Vermont homes (591 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is J C McNeil?
J C McNeil is in Chittenden County, Vermont, at about 44.492°, -73.208°. It is one of 24 power plants of 1 MW or more in the county. The average electricity customer in Chittenden County goes 2.3 hours a year without power, the 14th most of 14 counties in Vermont. The county's page has the full outage record.
Who operates J C McNeil?
It is operated by City of Burlington Electric - (VT) (EIA sector: Electric Utility), and it feeds ISO New England.
When did J C McNeil open?
Its oldest generator still running came online in 1984.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Vermont home's 591 kWh a month in 2025. Methodology.