Oil power plant · Chittenden, VT
Colchester 16
Colchester 16 is a 18 MW oil power plant in Chittenden County, Vermont, operated by Green Mountain Power Corp. Its oldest generator still running came online in 1965. In 2025 it generated 0.3 GWh, about what 42 average Vermont homes use in a year.
Colchester 16 in context
Among the 9 other-fuel plants in Vermont in the EIA's inventory, it is the 6th largest, about 7.6% of the state's 236 MW of other-fuel capacity.
Chittenden County has 24 power plants of 1 MW or more with 196 MW in all; Colchester 16 is 9% of that and the 3rd largest of 3 oil plants there.
Its capacity factor of 0% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in Chittenden County goes 2.3 hours a year without power, the 14th most of 14 counties in Vermont. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Colchester 16 (outlined) and other plants in Chittenden County, shaded. 44.491, -73.170.
Plant facts
- Operator
- Green Mountain Power Corp
- Sector
- Electric Utility
- Grid operator
- ISNE
- County
- Chittenden County, VT
- EIA plant ID
- 3735
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GT1 | Petroleum Liquids | 18 MW | 1965 | – |
Nearby
Other plants in Chittenden County
Questions
Colchester 16, answered
How much power does Colchester 16 produce?
Colchester 16 has 18 MW of capacity from one generator. In 2025 it generated 0.3 GWh, 0% of the most it could have made running flat out all year (its capacity factor).
How many homes does Colchester 16 power?
Its 2025 output of 0.3 GWh equals the yearly electricity use of about 42 average Vermont homes (591 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Colchester 16?
Colchester 16 is in Chittenden County, Vermont, at about 44.491°, -73.170°. It is one of 24 power plants of 1 MW or more in the county. The average electricity customer in Chittenden County goes 2.3 hours a year without power, the 14th most of 14 counties in Vermont. The county's page has the full outage record.
Who operates Colchester 16?
It is operated by Green Mountain Power Corp (EIA sector: Electric Utility), and it feeds ISO New England.
When did Colchester 16 open?
Its oldest generator still running came online in 1965.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Vermont home's 591 kWh a month in 2025. Methodology.