Oil power plant · Franklin, VT
VPPSA Project 10
VPPSA Project 10 is a 47 MW oil power plant in Franklin County, Vermont, operated by Vermont Public Power Supply Authority. Its oldest generator still running came online in 2010. In 2025 it generated 1.2 GWh, about what 169 average Vermont homes use in a year.
VPPSA Project 10 in context
Among the 9 other-fuel plants in Vermont in the EIA's inventory, it is the 2nd largest, about 20% of the state's 236 MW of other-fuel capacity.
Franklin County has 8 power plants of 1 MW or more with 102 MW in all; VPPSA Project 10 is 46% of that.
Its capacity factor of 0% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in Franklin County goes 4.5 hours a year without power, the 13th most of 14 counties in Vermont. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
VPPSA Project 10 (outlined) and other plants in Franklin County, shaded. 44.917, -73.100.
Plant facts
- Operator
- Vermont Public Power Supply Authority
- Sector
- Electric Utility
- Grid operator
- ISNE
- County
- Franklin County, VT
- EIA plant ID
- 63203
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 12510 | Petroleum Liquids | 24 MW | 2010 | – |
| 12511 | Petroleum Liquids | 24 MW | 2010 | – |
Nearby
Other plants in Franklin County
Questions
VPPSA Project 10, answered
How much power does VPPSA Project 10 produce?
VPPSA Project 10 has 47 MW of capacity from 2 generators. In 2025 it generated 1.2 GWh, 0% of the most it could have made running flat out all year (its capacity factor).
How many homes does VPPSA Project 10 power?
Its 2025 output of 1.2 GWh equals the yearly electricity use of about 169 average Vermont homes (591 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is VPPSA Project 10?
VPPSA Project 10 is in Franklin County, Vermont, at about 44.917°, -73.100°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Franklin County goes 4.5 hours a year without power, the 13th most of 14 counties in Vermont. The county's page has the full outage record.
Who operates VPPSA Project 10?
It is operated by Vermont Public Power Supply Authority (EIA sector: Electric Utility), and it feeds ISO New England.
When did VPPSA Project 10 open?
Its oldest generator still running came online in 2010.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average Vermont home's 591 kWh a month in 2025. Methodology.