Wilder is a 36 MW hydro power plant in Windsor County, Vermont, operated by Great River Hydro, LLC. Its oldest generator still running came online in 1950. In 2025 it generated 134 GWh, about what 19,000 average Vermont homes use in a year.
Wilder in context
Among the 46 hydro plants in Vermont in the EIA's inventory, it is the 3rd largest, about 11% of the state's 336 MW of hydro capacity.
Windsor County has 10 power plants of 1 MW or more with 89 MW in all; Wilder is 40% of that and the largest of 4 hydro plants there.
Its capacity factor of 43% in 2025 is higher than the 34% typical for hydro plants across the US.
The average electricity customer in Windsor County goes 15 hours a year without power, the 4th most of 14 counties in Vermont. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Wilder (outlined) and other plants in Windsor County, shaded. 43.668, -72.304.
Plant facts
- Operator
- Great River Hydro, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ISNE
- County
- Windsor County, VT
- EIA plant ID
- 2353
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Conventional Hydroelectric | 16 MW | 1950 | – |
| GEN2 | Conventional Hydroelectric | 16 MW | 1950 | – |
| GEN3 | Conventional Hydroelectric | 3.2 MW | 1987 | – |
Nearby
Other plants in Windsor County
Questions
Wilder, answered
How much power does Wilder produce?
Wilder has 36 MW of capacity from 3 generators. In 2025 it generated 134 GWh, 43% of the most it could have made running flat out all year (its capacity factor).
How many homes does Wilder power?
Its 2025 output of 134 GWh equals the yearly electricity use of about 19,000 average Vermont homes (591 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Wilder?
Wilder is in Windsor County, Vermont, at about 43.668°, -72.304°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Windsor County goes 15 hours a year without power, the 4th most of 14 counties in Vermont. The county's page has the full outage record.
Who operates Wilder?
It is operated by Great River Hydro, LLC (EIA sector: IPP Non-CHP), and it feeds ISO New England.
When did Wilder open?
Its oldest generator still running came online in 1950.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Vermont home's 591 kWh a month in 2025. Methodology.