Bishopville Solar, LLC is a 20 MW solar power plant in Lee County, South Carolina, operated by Headwater Energy, LLC. Its oldest generator still running came online in 2025.
Bishopville Solar, LLC in context
Among the 128 solar plants in South Carolina in the EIA's inventory, it is the 26th largest, about 1.0% of the state's 2.1 GW of solar capacity.
Lee County has 10 power plants of 1 MW or more with 50 MW in all; Bishopville Solar, LLC is 40% of that and the largest of 9 solar plants there.
The average electricity customer in Lee County goes 7.3 hours a year without power, the 26th most of 46 counties in South Carolina. The county's page has the full outage record.
Where it is
Bishopville Solar, LLC (outlined) and other plants in Lee County, shaded. 34.203, -80.231.
Plant facts
- Operator
- Headwater Energy, LLC
- Sector
- IPP Non-CHP
- Grid operator
- CPLE
- County
- Lee County, SC
- EIA plant ID
- 70432
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 27 | Solar Photovoltaic | 20 MW | 2025 | – |
Nearby
Other plants in Lee County
Questions
Bishopville Solar, LLC, answered
How much power does Bishopville Solar, LLC produce?
Bishopville Solar, LLC has 20 MW of capacity from one generator. No full year of generation is reported yet.
Where is Bishopville Solar, LLC?
Bishopville Solar, LLC is in Lee County, South Carolina, at about 34.203°, -80.231°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Lee County goes 7.3 hours a year without power, the 26th most of 46 counties in South Carolina. The county's page has the full outage record.
Who operates Bishopville Solar, LLC?
It is operated by Headwater Energy, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority CPLE.
When did Bishopville Solar, LLC open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.