Where the power comes from · 2025
South Carolina
Nuclear made 54% of the electricity generated in South Carolina in 2025, the 2nd highest nuclear share of any state. In 2005, coal made 38% of it; in 2025, 17%.
The mix
South Carolina's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
South Carolina's power plants
217 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in South Carolina, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
South Carolina's power plants emitted 267 kg of CO₂ for each MWh they generated in 2024, against 398 kg in 2005: the 13th lowest of 51. 27 million metric tons in all.
South Carolina among the states
- Generation104 TWh15th
- Renewable share6%45th
- Carbon-free share61%11th
- Cleanest electricity (kg CO₂/MWh, 2024)26713th
- Nuclear share54%2nd
- Natural gas share22%37th
- Coal share17%20th
- Solar share3.1%29th
More on South Carolina
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in South Carolina
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Oconee | Nuclear | Oconee | 2.7 GW | 22 TWh | 96% | 1973 |
| Cross | Coal | Berkeley | 2.5 GW | 8.8 TWh | 41% | 1984 |
| Catawba | Nuclear | York | 2.4 GW | 19 TWh | 92% | 1985 |
| Bad Creek | Storage | Oconee | 1.7 GW | -550.1 GWh | – | 1991 |
| Winyah | Coal | Georgetown | 1.3 GW | 4.2 TWh | 38% | 1975 |
| John S Rainey | Natural gas | Anderson | 1.2 GW | 4.8 TWh | 47% | 2001 |
| Jasper | Natural gas | Jasper | 1.1 GW | 3.6 TWh | 39% | 2004 |
| V C Summer | Nuclear | Fairfield | 1.0 GW | 8.1 TWh | 90% | 1984 |
| Broad River Energy Center | Natural gas | Cherokee | 985 MW | 995 GWh | 12% | 2000 |
| W S Lee | Natural gas | Anderson | 955 MW | 6.0 TWh | 72% | 2007 |
| Mill Creek (SC) | Natural gas | Cherokee | 799 MW | 117 GWh | 2% | 2002 |
| Jocassee | Storage | Pickens | 774 MW | -212.0 GWh | – | 1973 |
| Wateree | Coal | Richland | 772 MW | 2.4 TWh | 35% | 1970 |
| H B Robinson | Nuclear | Darlington | 769 MW | 6.7 TWh | 100% | 1971 |
| Urquhart | Natural gas | Aiken | 759 MW | 1.6 TWh | 24% | 1953 |
| Columbia Energy Center (SC) | Natural gas | Calhoun | 669 MW | 3.0 TWh | 52% | 2004 |
| Williams | Coal | Berkeley | 660 MW | 2.4 TWh | 42% | 1973 |
| Fairfield Pumped Storage | Storage | Fairfield | 587 MW | 479 GWh | – | 1978 |
| Cope | Natural gas | Orangeburg | 417 MW | 1.7 TWh | 48% | 1996 |
| J Strom Thurmond | Hydro | McCormick | 362 MW | 566 GWh | 18% | 1953 |
| Darlington County | Natural gas | Darlington | 316 MW | 56 GWh | 2% | 1997 |
| McMeekin | Natural gas | Lexington | 294 MW | 228 GWh | 9% | 1958 |
| Saluda Lexington | Hydro | Lexington | 207 MW | 92 GWh | 5% | 1930 |
| Hagood | Natural gas | Charleston | 177 MW | 33 GWh | 2% | 1991 |
| Keowee | Hydro | Pickens | 158 MW | 44 GWh | 3% | 1971 |
| Jefferies | Hydro | Berkeley | 145 MW | 234 GWh | 18% | 1942 |
| Lone Star Solar | Solar | Calhoun | 132 MW | 164 GWh | 14% | 2024 |
| Parr GT | Natural gas | Fairfield | 131 MW | 0.0 GWh | – | 2025 |
| Hilton Head | Oil | Beaufort | 118 MW | 0.1 GWh | 0% | 1973 |
| Cherokee County Cogen | Natural gas | Cherokee | 118 MW | 644 GWh | 63% | 1998 |
| Myrtle Beach | Oil | Horry | 112 MW | -0.5 GWh | – | 1962 |
| Sylvamo Corporation Eastover Facility | Biomass | Richland | 110 MW | 565 GWh | 59% | 1984 |
| SR Lambert I, LLC | Solar | Georgetown | 100 MW | 11 GWh | – | 2025 |
| SR Lambert II | Solar | Georgetown | 100 MW | 11 GWh | – | 2025 |
| International Paper Georgetown Mill | Biomass | Georgetown | 96 MW | 0.0 GWh | – | 1966 |
| Eastover Solar | Solar | Richland | 92 MW | 144 GWh | 18% | 2023 |
| Florence Mill | Biomass | Florence | 92 MW | 419 GWh | 52% | 1974 |
| Wateree Hydro | Hydro | Kershaw | 91 MW | 137 GWh | 17% | 1919 |
| St Stephen | Hydro | Berkeley | 84 MW | 161 GWh | 22% | 1985 |
| Palmetto Plains | Solar | Orangeburg | 75 MW | 126 GWh | 19% | 2019 |
| TWE Bowman Solar Project | Solar | Orangeburg | 75 MW | 144 GWh | 22% | 2020 |
| Huntley | Solar | Orangeburg | 75 MW | 158 GWh | 24% | 2020 |
| Allora Solar, LLC | Solar | Lexington | 75 MW | 154 GWh | 23% | 2023 |
| Centerfield Cooper Solar, LLC | Solar | Chesterfield | 75 MW | 140 GWh | 21% | 2020 |
| Gunsight Solar, LLC | Solar | Lexington | 75 MW | 174 GWh | 26% | 2022 |
| Catalina Solar (SC) | Solar | Saluda | 75 MW | 26 GWh | – | 2025 |
| Shaw Creek Solar, LLC | Solar | Aiken | 75 MW | 166 GWh | 25% | 2019 |
| Beulah Solar | Solar | Saluda | 75 MW | 152 GWh | 23% | 2022 |
| Seabrook Solar | Solar | Beaufort | 73 MW | 93 GWh | 15% | 2019 |
| Midlands | Solar | Calhoun | 72 MW | 156 GWh | 25% | 2020 |
| Moffett Solar Project | Solar | Jasper | 71 MW | 139 GWh | 22% | 2017 |
| Lily Solar | Solar | Allendale | 70 MW | 162 GWh | 26% | 2020 |
| Bushy Park Combustion Turbine Facility | Natural gas | Berkeley | 65 MW | 19 GWh | 3% | 2024 |
| Wylie | Hydro | York | 60 MW | 99 GWh | 19% | 1925 |
| Landrace Holdings, LLC | Solar | Horry | 55 MW | 115 GWh | 24% | 2023 |
| Marlboro Mill | Biomass | Marlboro | 51 MW | 214 GWh | 47% | 2010 |
| Cedar Creek (SC) | Hydro | Lancaster | 45 MW | 102 GWh | 26% | 1926 |
| Dearborn | Hydro | Chester | 45 MW | 70 GWh | 18% | 1923 |
| Fishing Creek | Hydro | Chester | 42 MW | 77 GWh | 21% | 1916 |
| Beaverdam Renewable Energy Center | Solar | Laurens | 41 MW | – | – | 2026 |
| Sonoco Products Co | Biomass | Darlington | 41 MW | 65 GWh | 18% | 1947 |
| Peony Solar | Solar | Orangeburg | 39 MW | 71 GWh | 21% | 2018 |
| Allendale Biomass | Biomass | Allendale | 23 MW | 151 GWh | 77% | 2013 |
| Dorchester Biomass | Biomass | Dorchester | 23 MW | 150 GWh | 76% | 2013 |
| Savannah River Site Biomass Cogen | Biomass | Aiken | 21 MW | 93 GWh | 51% | 2012 |
| Cameron Solar | Solar | Calhoun | 20 MW | 38 GWh | 22% | 2017 |
| Estill Solar | Solar | Hampton | 20 MW | 24 GWh | 14% | 2017 |
| Hampton Solar 2 | Solar | Hampton | 20 MW | 41 GWh | 24% | 2017 |
| Blackville Solar II | Solar | Barnwell | 20 MW | 37 GWh | 21% | 2019 |
| Pinson Solar Farm | Solar | Spartanburg | 20 MW | 30 GWh | 17% | 2022 |
| Bishopville Solar, LLC | Solar | Lee | 20 MW | 0.0 GWh | – | 2025 |
| Camden South Carolina | Natural gas | Kershaw | 19 MW | 0.0 GWh | – | 1993 |
| Lockhart | Hydro | Union | 18 MW | 49 GWh | 31% | 1921 |
| MCRD Parris Island PV Hybrid | Solar | Beaufort | 17 MW | 31 GWh | 21% | 2018 |
| Parr Hydro | Hydro | Fairfield | 15 MW | 53 GWh | 41% | 1914 |
| North Road Peak | Oil | Orangeburg | 14 MW | 2.1 GWh | 2% | 1987 |
| Duke Energy CHP at Clemson University | Natural gas | Pickens | 13 MW | 103 GWh | 88% | 2019 |
| Midway Green Solar | Solar | Union | 13 MW | 21 GWh | 18% | 2020 |
| Great Falls (SC) | Hydro | Chester | 12 MW | 0.0 GWh | – | 1907 |
| 99 Islands | Hydro | Cherokee | 12 MW | 31 GWh | 30% | 1910 |
| Trask East Solar | Solar | Beaufort | 12 MW | 28 GWh | 27% | 2020 |
| BMW Manufacturing Co | Biomass | Spartanburg | 11 MW | 30 GWh | 31% | 2009 |
| Swamp Fox Solar | Solar | Lexington | 11 MW | 21 GWh | 22% | 2017 |
| Champion Solar | Solar | Lexington | 11 MW | 11 GWh | 11% | 2017 |
| Columbia Canal Hydro | Hydro | Richland | 11 MW | – | – | 1927 |
| St. Matthews Solar | Solar | Calhoun | 10 MW | 17 GWh | 19% | 2017 |
| Estill Solar II | Solar | Allendale | 10 MW | 19 GWh | 21% | 2017 |
| Gaston Solar I - SC | Solar | Lexington | 10 MW | 17 GWh | 19% | 2018 |
| Southern Current One, LLC | Solar | Allendale | 10 MW | 12 GWh | 14% | 2017 |
| Seneca City of | Oil | Oconee | 10 MW | 0.7 GWh | 1% | 2004 |
| Whitetail Solar | Solar | Dillon | 10 MW | 21 GWh | 24% | 2021 |
| Ridgeland Solar Project | Solar | Jasper | 10 MW | 20 GWh | 23% | 2017 |
| Darlington Solar, LLC | Solar | Darlington | 10 MW | 15 GWh | 17% | 2016 |
| Rankin Solar Center, LLC | Solar | Florence | 10 MW | 18 GWh | 20% | 2019 |
| Yemassee Solar | Solar | Beaufort | 10 MW | 23 GWh | 26% | 2020 |
| Cherry Blossom Solar LLC | Solar | Williamsburg | 10 MW | 19 GWh | 22% | 2019 |
| Bishopville Solar II, LLC | Solar | Lee | 10 MW | 16 GWh | 18% | 2022 |
| Sunflower Solar LLC | Solar | Williamsburg | 10 MW | 24 GWh | 27% | 2024 |
| Ebbie Solar, LLC | Solar | Marion | 10 MW | 0.0 GWh | – | 2025 |
| Rowesville Rd Plant | Natural gas | Orangeburg | 9.6 MW | 0.9 GWh | 1% | 1994 |
Coming next
Planned projects
The largest generators reported as planned in South Carolina, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Pinopolis BESS | Storage | Berkeley | 300 MW | 2027 |
| Kingstree East 230 Solar Project | Solar | Georgetown | 249 MW | 2029 |
| SR Cordova | Solar | Orangeburg | 100 MW | 2027 |
| Robinson Solar Plant | Solar | Chesterfield | 76 MW | 2027 |
| Lotus Solar | Solar | Darlington | 75 MW | 2027 |
| Kingstree West 115 | Solar | Williamsburg | 75 MW | 2026 |
| B & K Solar | Solar | Darlington | 75 MW | 2026 |
| Big Fork Solar | Storage | Barnwell | 75 MW | 2027 |
| Big Fork Solar | Solar | Barnwell | 75 MW | 2028 |
| Juniper Solar | Solar | Chesterfield | 75 MW | 2027 |
| Culpepper Solar | Solar | Darlington | 75 MW | 2027 |
| Rollins Solar | Solar | Darlington | 75 MW | 2027 |
| Ross Solar | Solar | Darlington | 75 MW | 2027 |
| Colleton Solar | Solar | Colleton | 75 MW | 2028 |
| Holliday Solar I | Solar | Horry | 74 MW | 2028 |
| Shining Sun Solar | Solar | Orangeburg | 74 MW | 2028 |
| Hudson Place Solar Plant | Solar | Newberry | 71 MW | 2028 |
| Melsam Solar | Solar | Dillon | 65 MW | 2028 |
| Shorthorn Solar | Solar | Lee | 60 MW | 2027 |
| Winyah | Oil | Georgetown | 57 MW | 2027 |
| Winyah | Oil | Georgetown | 57 MW | 2027 |
| SR Georgetown | Solar | Georgetown | 50 MW | 2026 |
| Crossroads Solar | Solar | Barnwell | 50 MW | 2028 |
| GEB Solar | Solar | Darlington | 50 MW | 2028 |
| Quest Solar | Solar | Allendale | 50 MW | 2028 |
| Bush River Solar Plant | Solar | Laurens | 45 MW | 2028 |
| Cotton Solar | Solar | Dillon | 16 MW | 2027 |
| Rhubarb One SC | Solar | Marion | 9.6 MW | 2027 |
| Longtown Energy Storage | Storage | Fairfield | 4.5 MW | 2026 |
Shut down
Retired since 2010
The largest generators retired in South Carolina since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Canadys Steam | Coal | 218 MW | 2013 |
| H B Robinson | Coal | 207 MW | 2012 |
| Jefferies | Coal | 173 MW | 2012 |
| Jefferies | Coal | 173 MW | 2012 |
| W S Lee | Natural gas | 163 MW | 2022 |
| Canadys Steam | Coal | 136 MW | 2013 |
| Canadys Steam | Coal | 136 MW | 2012 |
| Kapstone | Biomass | 99 MW | 2023 |
| W S Lee | Coal | 90 MW | 2014 |
| W S Lee | Coal | 90 MW | 2014 |
| Dolphus M Grainger | Coal | 82 MW | 2012 |
| Dolphus M Grainger | Coal | 82 MW | 2012 |
| Darlington County | Natural gas | 67 MW | 2020 |
| Darlington County | Natural gas | 67 MW | 2020 |
| Darlington County | Natural gas | 67 MW | 2020 |
| Darlington County | Natural gas | 67 MW | 2018 |
| Darlington County | Oil | 67 MW | 2017 |
| Darlington County | Oil | 67 MW | 2015 |
| Darlington County | Oil | 66 MW | 2020 |
| Darlington County | Oil | 66 MW | 2020 |
| Darlington County | Oil | 66 MW | 2020 |
| Darlington County | Oil | 66 MW | 2020 |
| Darlington County | Oil | 66 MW | 2020 |
| Jefferies | Oil | 50 MW | 2015 |
| Jefferies | Oil | 50 MW | 2015 |
| Williams | Natural gas | 27 MW | 2022 |
| Williams | Natural gas | 27 MW | 2022 |
| Buzzard Roost GT | Natural gas | 23 MW | 2012 |
| Buzzard Roost GT | Natural gas | 23 MW | 2012 |
| Buzzard Roost GT | Natural gas | 23 MW | 2012 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.