Biomass power plant · Richland, SC
Sylvamo Corporation Eastover Facility
Sylvamo Corporation Eastover Facility is a 110 MW biomass power plant in Richland County, South Carolina, operated by Sylvamo Corporation - Eastover. Its oldest generator still running came online in 1984. In 2025 it generated 565 GWh, about what 44,000 average South Carolina homes use in a year.
Sylvamo Corporation Eastover Facility in context
Among the 29 other-fuel plants in South Carolina in the EIA's inventory, it is the 3rd largest, about 14% of the state's 786 MW of other-fuel capacity.
Richland County has 5 power plants of 1 MW or more with 993 MW in all; Sylvamo Corporation Eastover Facility is 11% of that and the largest of 2 biomass plants there.
Its capacity factor of 59% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Richland County goes 4.5 hours a year without power, the 33rd most of 46 counties in South Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Sylvamo Corporation Eastover Facility (outlined) and other plants in Richland County, shaded. 33.887, -80.640.
Plant facts
- Operator
- Sylvamo Corporation - Eastover
- Sector
- Industrial CHP
- Grid operator
- SCEG
- County
- Richland County, SC
- EIA plant ID
- 52151
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN2 | Wood/Wood Waste Biomass | 61 MW | 1991 | – |
| GEN1 | Wood/Wood Waste Biomass | 48 MW | 1984 | – |
Nearby
Other plants in Richland County
Questions
Sylvamo Corporation Eastover Facility, answered
How much power does Sylvamo Corporation Eastover Facility produce?
Sylvamo Corporation Eastover Facility has 110 MW of capacity from 2 generators. In 2025 it generated 565 GWh, 59% of the most it could have made running flat out all year (its capacity factor).
How many homes does Sylvamo Corporation Eastover Facility power?
Its 2025 output of 565 GWh equals the yearly electricity use of about 44,000 average South Carolina homes (1,066 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Sylvamo Corporation Eastover Facility?
Sylvamo Corporation Eastover Facility is in Richland County, South Carolina, at about 33.887°, -80.640°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Richland County goes 4.5 hours a year without power, the 33rd most of 46 counties in South Carolina. The county's page has the full outage record.
Who operates Sylvamo Corporation Eastover Facility?
It is operated by Sylvamo Corporation - Eastover (EIA sector: Industrial CHP), and it feeds balancing authority SCEG.
When did Sylvamo Corporation Eastover Facility open?
Its oldest generator still running came online in 1984.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average South Carolina home's 1,066 kWh a month in 2025. Methodology.