Solar power plant · Saluda, SC
Catalina Solar (SC)
Catalina Solar (SC) is a 75 MW solar power plant in Saluda County, South Carolina, operated by Modal Power LLC. Its oldest generator still running came online in 2025. In 2025 it generated 26 GWh, about what 2,000 average South Carolina homes use in a year.
Catalina Solar (SC) in context
Among the 128 solar plants in South Carolina in the EIA's inventory, it is the 11th largest, about 3.6% of the state's 2.1 GW of solar capacity.
Saluda County has 4 power plants of 1 MW or more with 160 MW in all; Catalina Solar (SC) is 47% of that and the largest of 4 solar plants there.
The average electricity customer in Saluda County goes 24 hours a year without power, the 6th most of 46 counties in South Carolina. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Catalina Solar (SC) (outlined) and other plants in Saluda County, shaded. 33.903, -81.601.
Plant facts
- Operator
- Modal Power LLC
- Sector
- IPP Non-CHP
- Grid operator
- DUK
- County
- Saluda County, SC
- EIA plant ID
- 68060
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| CAT01 | Solar Photovoltaic | 75 MW | 2025 | – |
Nearby
Other plants in Saluda County
Questions
Catalina Solar (SC), answered
How much power does Catalina Solar (SC) produce?
Catalina Solar (SC) has 75 MW of capacity from one generator. In 2025 it generated 26 GWh.
How many homes does Catalina Solar (SC) power?
Its 2025 output of 26 GWh equals the yearly electricity use of about 2,000 average South Carolina homes (1,066 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Catalina Solar (SC)?
Catalina Solar (SC) is in Saluda County, South Carolina, at about 33.903°, -81.601°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Saluda County goes 24 hours a year without power, the 6th most of 46 counties in South Carolina. The county's page has the full outage record.
Who operates Catalina Solar (SC)?
It is operated by Modal Power LLC (EIA sector: IPP Non-CHP), and it feeds Duke Energy Carolinas.
When did Catalina Solar (SC) open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average South Carolina home's 1,066 kWh a month in 2025. Methodology.