Solar power plant · Allendale, SC
Estill Solar II
Estill Solar II is a 10 MW solar power plant in Allendale County, South Carolina, operated by Cypress Creek Renewables. Its oldest generator still running came online in 2017. In 2025 it generated 19 GWh, about what 1,500 average South Carolina homes use in a year.
Estill Solar II in context
Among the 128 solar plants in South Carolina in the EIA's inventory, it is the 33rd largest, about 0.5% of the state's 2.1 GW of solar capacity.
Allendale County has 5 power plants of 1 MW or more with 121 MW in all; Estill Solar II is 8% of that and the 2nd largest of 4 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Allendale County goes 13 hours a year without power, the 16th most of 46 counties in South Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Estill Solar II (outlined) and other plants in Allendale County, shaded. 32.728, -81.253.
Plant facts
- Operator
- Cypress Creek Renewables
- Sector
- IPP Non-CHP
- Grid operator
- SCEG
- County
- Allendale County, SC
- EIA plant ID
- 61529
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | 10 MW | 2017 | – |
Nearby
Other plants in Allendale County
Questions
Estill Solar II, answered
How much power does Estill Solar II produce?
Estill Solar II has 10 MW of capacity from one generator. In 2025 it generated 19 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Estill Solar II power?
Its 2025 output of 19 GWh equals the yearly electricity use of about 1,500 average South Carolina homes (1,066 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Estill Solar II?
Estill Solar II is in Allendale County, South Carolina, at about 32.728°, -81.253°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Allendale County goes 13 hours a year without power, the 16th most of 46 counties in South Carolina. The county's page has the full outage record.
Who operates Estill Solar II?
It is operated by Cypress Creek Renewables (EIA sector: IPP Non-CHP), and it feeds balancing authority SCEG.
When did Estill Solar II open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average South Carolina home's 1,066 kWh a month in 2025. Methodology.