Oil power plant · Oconee, SC
Seneca City of
Seneca City of is a 10 MW oil power plant in Oconee County, South Carolina, operated by City of Seneca - (SC). Its oldest generator still running came online in 2004. In 2025 it generated 0.7 GWh, about what 55 average South Carolina homes use in a year.
Seneca City of in context
Among the 29 other-fuel plants in South Carolina in the EIA's inventory, it is the 13th largest, about 1.3% of the state's 786 MW of other-fuel capacity.
Oconee County has 4 power plants of 1 MW or more with 4.4 GW in all; Seneca City of is 0% of that and the largest of 2 oil plants there.
Its capacity factor of 1% in 2025 is lower than the 25% typical for oil plants across the US.
The average electricity customer in Oconee County goes 22 hours a year without power, the 8th most of 46 counties in South Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Seneca City of (outlined) and other plants in Oconee County, shaded. 34.688, -82.953.
Plant facts
- Operator
- City of Seneca - (SC)
- Sector
- Electric Utility
- Grid operator
- DUK
- County
- Oconee County, SC
- EIA plant ID
- 56545
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PPG1 | Petroleum Liquids | 2.0 MW | 2004 | – |
| PPG2 | Petroleum Liquids | 2.0 MW | 2004 | – |
| PPG3 | Petroleum Liquids | 2.0 MW | 2004 | – |
| WPG1 | Petroleum Liquids | 2.0 MW | 2004 | – |
| WPG2 | Petroleum Liquids | 2.0 MW | 2004 | – |
Nearby
Other plants in Oconee County
Questions
Seneca City of, answered
How much power does Seneca City of produce?
Seneca City of has 10 MW of capacity from 5 generators. In 2025 it generated 0.7 GWh, 1% of the most it could have made running flat out all year (its capacity factor).
How many homes does Seneca City of power?
Its 2025 output of 0.7 GWh equals the yearly electricity use of about 55 average South Carolina homes (1,066 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Seneca City of?
Seneca City of is in Oconee County, South Carolina, at about 34.688°, -82.953°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Oconee County goes 22 hours a year without power, the 8th most of 46 counties in South Carolina. The county's page has the full outage record.
Who operates Seneca City of?
It is operated by City of Seneca - (SC) (EIA sector: Electric Utility), and it feeds Duke Energy Carolinas.
When did Seneca City of open?
Its oldest generator still running came online in 2004.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average South Carolina home's 1,066 kWh a month in 2025. Methodology.