TWE Bowman Solar Project is a 75 MW solar power plant in Orangeburg County, South Carolina, operated by SunStrong Management. Its oldest generator still running came online in 2020. In 2025 it generated 144 GWh, about what 11,000 average South Carolina homes use in a year.

Capacity75 MWNameplate, September 2026
Generated144 GWhIn 2025
Capacity factor22%Share of the most it could make, 2025
Generators1Oldest from 2020

TWE Bowman Solar Project in context

Among the 128 solar plants in South Carolina in the EIA's inventory, it is the 6th largest, about 3.6% of the state's 2.1 GW of solar capacity.

Orangeburg County has 11 power plants of 1 MW or more with 716 MW in all; TWE Bowman Solar Project is 10% of that and the 2nd largest of 6 solar plants there.

Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Orangeburg County goes 3.0 hours a year without power, the 44th most of 46 counties in South Carolina. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

050100150200202020212022202320242025GWh 144
050100150200202020212022202320242025144

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

TWE Bowman Solar Project (outlined) and other plants in Orangeburg County, shaded. 33.316, -80.682.

Plant facts

Operator
SunStrong Management
Sector
IPP Non-CHP
Grid operator
SCEG
County
Orangeburg County, SC
EIA plant ID
62828
Where South Carolina's power comes from → South Carolina power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BOW Solar Photovoltaic 75 MW 2020 –

Nearby

Other plants in Orangeburg County

Cope · 417 MWPalmetto Plains · 75 MWHuntley · 75 MWPeony Solar · 39 MWNorth Road Peak · 14 MWRowesville Rd Plant · 9.6 MWSCE&G Springfield CSG · 6.1 MWBull Street Plant · 2.0 MW

Questions

TWE Bowman Solar Project, answered

How much power does TWE Bowman Solar Project produce?

TWE Bowman Solar Project has 75 MW of capacity from one generator. In 2025 it generated 144 GWh, 22% of the most it could have made running flat out all year (its capacity factor).

How many homes does TWE Bowman Solar Project power?

Its 2025 output of 144 GWh equals the yearly electricity use of about 11,000 average South Carolina homes (1,066 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is TWE Bowman Solar Project?

TWE Bowman Solar Project is in Orangeburg County, South Carolina, at about 33.316°, -80.682°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Orangeburg County goes 3.0 hours a year without power, the 44th most of 46 counties in South Carolina. The county's page has the full outage record.

Who operates TWE Bowman Solar Project?

It is operated by SunStrong Management (EIA sector: IPP Non-CHP), and it feeds balancing authority SCEG.

When did TWE Bowman Solar Project open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average South Carolina home's 1,066 kWh a month in 2025. Methodology.