Storage power plant · Elmore, ID
Black Mesa BESS
Black Mesa BESS is a 40 MW storage power plant in Elmore County, Idaho, operated by Idaho Power Co. Its oldest generator still running came online in 2024.
Black Mesa BESS in context
Among the 10 storage plants in Idaho in the EIA's inventory, it is the 6th largest, about 6.1% of the state's 659 MW of storage capacity.
Elmore County has 20 power plants of 1 MW or more with 928 MW in all; Black Mesa BESS is 4% of that and the largest of 2 storage plants there.
The average electricity customer in Elmore County goes 3.2 hours a year without power, the 26th most of 35 counties in Idaho. The county's page has the full outage record.
Where it is
Black Mesa BESS (outlined) and other plants in Elmore County, shaded. 42.908, -115.181.
Plant facts
- Operator
- Idaho Power Co
- Sector
- Electric Utility
- Grid operator
- IPCO
- County
- Elmore County, ID
- EIA plant ID
- 66326
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Batteries | 40 MW · 160 MWh | 2024 | – |
Questions
Black Mesa BESS, answered
How much can Black Mesa BESS store and deliver?
Black Mesa BESS can deliver up to 40 MW and hold 160 MWh of energy, from one battery or storage system. Its net energy in 2025 was -3.2 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Black Mesa BESS?
Black Mesa BESS is in Elmore County, Idaho, at about 42.908°, -115.181°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Elmore County goes 3.2 hours a year without power, the 26th most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Black Mesa BESS?
It is operated by Idaho Power Co (EIA sector: Electric Utility), and it feeds Idaho Power.
When did Black Mesa BESS open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.