Wind power plant · Elmore, ID
Mainline Windfarm
Mainline Windfarm is a 23 MW wind power plant in Elmore County, Idaho, operated by Mountain Air Projects, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 52 GWh, about what 4,700 average Idaho homes use in a year.
Mainline Windfarm in context
Among the 33 wind plants in Idaho in the EIA's inventory, it is the 10th largest, about 2.0% of the state's 1.1 GW of wind capacity.
Elmore County has 20 power plants of 1 MW or more with 928 MW in all; Mainline Windfarm is 2% of that and the 3rd largest of 10 wind plants there.
Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Elmore County goes 3.2 hours a year without power, the 26th most of 35 counties in Idaho. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Mainline Windfarm (outlined) and other plants in Elmore County, shaded. 43.048, -115.413.
Plant facts
- Operator
- Mountain Air Projects, LLC
- Sector
- IPP Non-CHP
- Grid operator
- IPCO
- County
- Elmore County, ID
- EIA plant ID
- 57429
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 23 MW | 2012 | – |
Questions
Mainline Windfarm, answered
How much power does Mainline Windfarm produce?
Mainline Windfarm has 23 MW of capacity from one generator. In 2025 it generated 52 GWh, 26% of the most it could have made running flat out all year (its capacity factor).
How many homes does Mainline Windfarm power?
Its 2025 output of 52 GWh equals the yearly electricity use of about 4,700 average Idaho homes (933 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Mainline Windfarm?
Mainline Windfarm is in Elmore County, Idaho, at about 43.048°, -115.413°. It is one of 20 power plants of 1 MW or more in the county. The average electricity customer in Elmore County goes 3.2 hours a year without power, the 26th most of 35 counties in Idaho. The county's page has the full outage record.
Who operates Mainline Windfarm?
It is operated by Mountain Air Projects, LLC (EIA sector: IPP Non-CHP), and it feeds Idaho Power.
When did Mainline Windfarm open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Idaho home's 933 kWh a month in 2025. Methodology.