Wind power plant · Lincoln, MN

Blazing Star Wind Farm 1

Blazing Star Wind Farm 1 is a 200 MW wind power plant in Lincoln County, Minnesota, operated by Northern States Power Co - Minnesota. Its oldest generator still running came online in 2020. In 2025 it generated 873 GWh, about what 98,000 average Minnesota homes use in a year.

Capacity200 MWNameplate, September 2026
Generated873 GWhIn 2025
Capacity factor50%Share of the most it could make, 2025
Generators1Oldest from 2020

Blazing Star Wind Farm 1 in context

Among the 122 wind plants in Minnesota in the EIA's inventory, it is the 10th largest, about 4.0% of the state's 5.0 GW of wind capacity.

Lincoln County has 25 power plants of 1 MW or more with 1.1 GW in all; Blazing Star Wind Farm 1 is 19% of that and the largest of 25 wind plants there.

Its capacity factor of 50% in 2025 is higher than the 32% typical for wind plants across the US.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02004006008001,0001,200202020212022202320242025GWh 873
02004006008001,0001,200202020212022202320242025873

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Blazing Star Wind Farm 1 (outlined) and other plants in Lincoln County, shaded. 44.544, -96.368.

Plant facts

Operator
Northern States Power Co - Minnesota
Sector
Electric Utility
Grid operator
MISO
County
Lincoln County, MN
EIA plant ID
60504
Where Minnesota's power comes from → Minnesota power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BLZG1 Onshore Wind Turbine 200 MW 2020 –

Questions

Blazing Star Wind Farm 1, answered

How much power does Blazing Star Wind Farm 1 produce?

Blazing Star Wind Farm 1 has 200 MW of capacity from one generator. In 2025 it generated 873 GWh, 50% of the most it could have made running flat out all year (its capacity factor).

How many homes does Blazing Star Wind Farm 1 power?

Its 2025 output of 873 GWh equals the yearly electricity use of about 98,000 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Blazing Star Wind Farm 1?

Blazing Star Wind Farm 1 is in Lincoln County, Minnesota, at about 44.544°, -96.368°. It is one of 25 power plants of 1 MW or more in the county.

Who operates Blazing Star Wind Farm 1?

It is operated by Northern States Power Co - Minnesota (EIA sector: Electric Utility), and it feeds MISO.

When did Blazing Star Wind Farm 1 open?

Its oldest generator still running came online in 2020.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2020–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.