Wind power plant · Lincoln, MN
Red Pine Wind Project
Red Pine Wind Project is a 200 MW wind power plant in Lincoln County, Minnesota, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2017. In 2025 it generated 774 GWh, about what 87,000 average Minnesota homes use in a year.
Red Pine Wind Project in context
Among the 122 wind plants in Minnesota in the EIA's inventory, it is the 11th largest, about 4.0% of the state's 5.0 GW of wind capacity.
Lincoln County has 25 power plants of 1 MW or more with 1.1 GW in all; Red Pine Wind Project is 19% of that and the 2nd largest of 25 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Red Pine Wind Project (outlined) and other plants in Lincoln County, shaded. 44.478, -96.154.
Plant facts
- Operator
- EDF Renewable Asset Holdings, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- MISO
- County
- Lincoln County, MN
- EIA plant ID
- 61357
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| RP1 | Onshore Wind Turbine | 200 MW | 2017 | – |
Questions
Red Pine Wind Project, answered
How much power does Red Pine Wind Project produce?
Red Pine Wind Project has 200 MW of capacity from one generator. In 2025 it generated 774 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Red Pine Wind Project power?
Its 2025 output of 774 GWh equals the yearly electricity use of about 87,000 average Minnesota homes (743 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Red Pine Wind Project?
Red Pine Wind Project is in Lincoln County, Minnesota, at about 44.478°, -96.154°. It is one of 25 power plants of 1 MW or more in the county.
Who operates Red Pine Wind Project?
It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds MISO.
When did Red Pine Wind Project open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Minnesota home's 743 kWh a month in 2025. Methodology.