Storage power plant · Wilbarger, TX
Blue Summit II Storage
Blue Summit II Storage is a 150 MW storage power plant in Wilbarger County, Texas, operated by Blue Summit II Storage, LLC. Its oldest generator still running came online in 2026.
Blue Summit II Storage in context
Among the 233 storage plants in Texas in the EIA's inventory, it is the 44th largest, about 0.9% of the state's 16 GW of storage capacity.
Wilbarger County has 7 power plants of 1 MW or more with 1.2 GW in all; Blue Summit II Storage is 13% of that and the largest of 2 storage plants there.
The average electricity customer in Wilbarger County goes 5.7 hours a year without power, the 184th most of 240 counties in Texas. The county's page has the full outage record.
Where it is
Blue Summit II Storage (outlined) and other plants in Wilbarger County, shaded. 34.292, -99.368.
Plant facts
- Operator
- Blue Summit II Storage, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Wilbarger County, TX
- EIA plant ID
- 68456
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BSIIS | Batteries | 150 MW · 150 MWh | 2026 | – |
Questions
Blue Summit II Storage, answered
How much can Blue Summit II Storage store and deliver?
Blue Summit II Storage can deliver up to 150 MW and hold 150 MWh of energy, from one battery or storage system.
Where is Blue Summit II Storage?
Blue Summit II Storage is in Wilbarger County, Texas, at about 34.292°, -99.368°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Wilbarger County goes 5.7 hours a year without power, the 184th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Blue Summit II Storage?
It is operated by Blue Summit II Storage, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Blue Summit II Storage open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.