Wind power plant · Wilbarger, TX

Western Trail Wind, LLC

Western Trail Wind, LLC is a 367 MW wind power plant in Wilbarger County, Texas, operated by Orsted Onshore North America. Its oldest generator still running came online in 2022. In 2025 it generated 1.1 TWh, about what 85,000 average Texas homes use in a year.

Capacity367 MWNameplate, September 2026
Generated1.1 TWhIn 2025
Capacity factor35%Share of the most it could make, 2025
Generators1Oldest from 2022

Western Trail Wind, LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 13th largest, about 0.8% of the state's 45 GW of wind capacity.

Wilbarger County has 7 power plants of 1 MW or more with 1.2 GW in all; Western Trail Wind, LLC is 31% of that and the largest of 5 wind plants there.

Its capacity factor of 35% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Wilbarger County goes 5.7 hours a year without power, the 184th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05001,0001,5002022202320242025GWh 1,131
05001,0001,50020222023202420251,131

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Western Trail Wind, LLC (outlined) and other plants in Wilbarger County, shaded. 33.852, -99.065.

Plant facts

Operator
Orsted Onshore North America
Sector
IPP Non-CHP
Grid operator
ERCO
County
Wilbarger County, TX
EIA plant ID
64149
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WTW Onshore Wind Turbine 367 MW 2022 –

Questions

Western Trail Wind, LLC, answered

How much power does Western Trail Wind, LLC produce?

Western Trail Wind, LLC has 367 MW of capacity from one generator. In 2025 it generated 1.1 TWh, 35% of the most it could have made running flat out all year (its capacity factor).

How many homes does Western Trail Wind, LLC power?

Its 2025 output of 1.1 TWh equals the yearly electricity use of about 85,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Western Trail Wind, LLC?

Western Trail Wind, LLC is in Wilbarger County, Texas, at about 33.852°, -99.065°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Wilbarger County goes 5.7 hours a year without power, the 184th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Western Trail Wind, LLC?

It is operated by Orsted Onshore North America (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Western Trail Wind, LLC open?

Its oldest generator still running came online in 2022.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.