Solar power plant · Bexar, TX

Blue Wing Solar Energy Generation

Blue Wing Solar Energy Generation is a 14 MW solar power plant in Bexar County, Texas, operated by Deriva Energy. Its oldest generator still running came online in 2010. In 2025 it generated 20 GWh, about what 1,500 average Texas homes use in a year.

Capacity14 MWNameplate, September 2026
Generated20 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2010

Blue Wing Solar Energy Generation in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 179th largest, about 0.0% of the state's 37 GW of solar capacity.

Bexar County has 26 power plants of 1 MW or more with 5.0 GW in all; Blue Wing Solar Energy Generation is 0% of that and the 2nd largest of 10 solar plants there.

Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

051015202520182019202020212022202320242025GWh 20
0510152025201920212023202520

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Blue Wing Solar Energy Generation (outlined) and other plants in Bexar County, shaded. 29.304, -98.400.

Plant facts

Operator
Deriva Energy
Sector
IPP Non-CHP
Grid operator
ERCO
County
Bexar County, TX
EIA plant ID
57197
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Solar Photovoltaic 14 MW 2010 –

Questions

Blue Wing Solar Energy Generation, answered

How much power does Blue Wing Solar Energy Generation produce?

Blue Wing Solar Energy Generation has 14 MW of capacity from one generator. In 2025 it generated 20 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does Blue Wing Solar Energy Generation power?

Its 2025 output of 20 GWh equals the yearly electricity use of about 1,500 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Blue Wing Solar Energy Generation?

Blue Wing Solar Energy Generation is in Bexar County, Texas, at about 29.304°, -98.400°. It is one of 26 power plants of 1 MW or more in the county. The average electricity customer in Bexar County goes 3.3 hours a year without power, the 219th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Blue Wing Solar Energy Generation?

It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Blue Wing Solar Energy Generation open?

Its oldest generator still running came online in 2010.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.