Wind power plant · Callahan, TX
BMP Wind (TX)
BMP Wind (TX) is a 340 MW wind power plant in Callahan County, Texas, operated by BMP Wind LLC. Its oldest generator still running came online in 2021. In 2025 it generated 870 GWh, about what 65,000 average Texas homes use in a year.
BMP Wind (TX) in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 15th largest, about 0.8% of the state's 45 GW of wind capacity.
Callahan County has 4 power plants of 1 MW or more with 676 MW in all; BMP Wind (TX) is 50% of that and the largest of 3 wind plants there.
Its capacity factor of 29% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Callahan County goes 19 hours a year without power, the 46th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
BMP Wind (TX) (outlined) and other plants in Callahan County, shaded. 32.289, -99.292.
Plant facts
- Operator
- BMP Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Callahan County, TX
- EIA plant ID
- 62809
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BMP | Onshore Wind Turbine | 340 MW | 2021 | – |
Nearby
Other plants in Callahan County
Questions
BMP Wind (TX), answered
How much power does BMP Wind (TX) produce?
BMP Wind (TX) has 340 MW of capacity from one generator. In 2025 it generated 870 GWh, 29% of the most it could have made running flat out all year (its capacity factor).
How many homes does BMP Wind (TX) power?
Its 2025 output of 870 GWh equals the yearly electricity use of about 65,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is BMP Wind (TX)?
BMP Wind (TX) is in Callahan County, Texas, at about 32.289°, -99.292°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Callahan County goes 19 hours a year without power, the 46th most of 240 counties in Texas. The county's page has the full outage record.
Who operates BMP Wind (TX)?
It is operated by BMP Wind LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did BMP Wind (TX) open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.