Wind power plant · Callahan, TX
Ranchland Wind Project II
Ranchland Wind Project II is a 148 MW wind power plant in Callahan County, Texas, operated by Ranchland Wind Project II, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 500 GWh, about what 38,000 average Texas homes use in a year.
Ranchland Wind Project II in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 163rd largest, about 0.3% of the state's 45 GW of wind capacity.
Callahan County has 4 power plants of 1 MW or more with 676 MW in all; Ranchland Wind Project II is 22% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 39% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Callahan County goes 19 hours a year without power, the 46th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Ranchland Wind Project II (outlined) and other plants in Callahan County, shaded. 32.309, -99.164.
Plant facts
- Operator
- Ranchland Wind Project II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Callahan County, TX
- EIA plant ID
- 64544
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT2 | Onshore Wind Turbine | 148 MW | 2024 | – |
Nearby
Other plants in Callahan County
Questions
Ranchland Wind Project II, answered
How much power does Ranchland Wind Project II produce?
Ranchland Wind Project II has 148 MW of capacity from one generator. In 2025 it generated 500 GWh, 39% of the most it could have made running flat out all year (its capacity factor).
How many homes does Ranchland Wind Project II power?
Its 2025 output of 500 GWh equals the yearly electricity use of about 38,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Ranchland Wind Project II?
Ranchland Wind Project II is in Callahan County, Texas, at about 32.309°, -99.164°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Callahan County goes 19 hours a year without power, the 46th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Ranchland Wind Project II?
It is operated by Ranchland Wind Project II, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Ranchland Wind Project II open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.