Natural gas power plant · Effingham, GA
Bobby C Smith Jr Energy Facility
Bobby C Smith Jr Energy Facility is a 597 MW natural gas power plant in Effingham County, Georgia, operated by Oglethorpe Power Corporation. Its oldest generator still running came online in 2003. In 2025 it generated 3.2 TWh, about what 247,000 average Georgia homes use in a year.
Bobby C Smith Jr Energy Facility in context
Among the 30 natural gas plants in Georgia in the EIA's inventory, it is the 13th largest, about 3.2% of the state's 19 GW of natural gas capacity.
Effingham County has 7 power plants of 1 MW or more with 3.0 GW in all; Bobby C Smith Jr Energy Facility is 20% of that and the 3rd largest of 3 natural gas plants there.
Its capacity factor of 61% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Effingham County goes 13 hours a year without power, the 50th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bobby C Smith Jr Energy Facility (outlined) and other plants in Effingham County, shaded. 32.277, -81.284.
Plant facts
- Operator
- Oglethorpe Power Corporation
- Sector
- Electric Utility
- Grid operator
- SOCO
- County
- Effingham County, GA
- EIA plant ID
- 55406
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| UNT1 | Natural Gas Fired Combined Cycle | 199 MW | 2003 | – |
| UNT2 | Natural Gas Fired Combined Cycle | 199 MW | 2003 | – |
| STG | Natural Gas Fired Combined Cycle | 198 MW | 2003 | – |
Nearby
Other plants in Effingham County
Questions
Bobby C Smith Jr Energy Facility, answered
How much power does Bobby C Smith Jr Energy Facility produce?
Bobby C Smith Jr Energy Facility has 597 MW of capacity from 3 generators. In 2025 it generated 3.2 TWh, 61% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bobby C Smith Jr Energy Facility power?
Its 2025 output of 3.2 TWh equals the yearly electricity use of about 247,000 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bobby C Smith Jr Energy Facility?
Bobby C Smith Jr Energy Facility is in Effingham County, Georgia, at about 32.277°, -81.284°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Effingham County goes 13 hours a year without power, the 50th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Bobby C Smith Jr Energy Facility?
It is operated by Oglethorpe Power Corporation (EIA sector: Electric Utility), and it feeds Southern Company.
When did Bobby C Smith Jr Energy Facility open?
Its oldest generator still running came online in 2003.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.