Where the power comes from · 2025
Georgia
Natural gas made 38% of the electricity generated in Georgia in 2025, the 24th highest natural gas share of any state. In 2005, coal made 64% of it; in 2025, 14%.
The mix
Georgia's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Georgia's power plants
267 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Georgia, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Georgia's power plants emitted 304 kg of CO₂ for each MWh they generated in 2024, against 660 kg in 2005: the 19th lowest of 51. 43 million metric tons in all.
Georgia among the states
- Generation147 TWh6th
- Renewable share13%34th
- Carbon-free share48%21st
- Cleanest electricity (kg CO₂/MWh, 2024)30419th
- Natural gas share38%24th
- Nuclear share35%8th
- Coal share14%23rd
- Solar share7.6%17th
Plants
The largest plants in Georgia
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Vogtle | Nuclear | Burke | 4.7 GW | 37 TWh | 91% | 1987 |
| Bowen | Coal | Bartow | 3.5 GW | 12 TWh | 40% | 1971 |
| Jack McDonough | Natural gas | Cobb | 2.8 GW | 17 TWh | 70% | 1971 |
| Scherer | Coal | Monroe | 2.7 GW | 7.7 TWh | 33% | 1982 |
| Edwin I Hatch | Nuclear | Appling | 1.8 GW | 14 TWh | 87% | 1975 |
| McIntosh Combined Cycle Facility | Natural gas | Effingham | 1.4 GW | 7.9 TWh | 65% | 2005 |
| Wansley Combined Cycle | Natural gas | Heard | 1.2 GW | 7.6 TWh | 70% | 2002 |
| Thomas A Smith Energy Facility | Natural gas | Murray | 1.2 GW | 8.3 TWh | 79% | 2002 |
| Tenaska Georgia Generation Facility | Natural gas | Heard | 1.1 GW | 103 GWh | 1% | 2001 |
| Dahlberg | Natural gas | Jackson | 919 MW | 287 GWh | 4% | 2000 |
| Rocky Mountain Hydroelectric Plant | Storage | Floyd | 848 MW | -452.6 GWh | – | 1995 |
| McIntosh | Natural gas | Effingham | 810 MW | 36 GWh | 1% | 1994 |
| Yates | Natural gas | Coweta | 807 MW | 1.2 TWh | 17% | 1974 |
| Washington County Power LLC | Natural gas | Washington | 796 MW | 504 GWh | 7% | 2003 |
| Talbot County Energy | Natural gas | Talbot | 726 MW | 412 GWh | 7% | 2002 |
| Edward L. Addison Generating Plant | Natural gas | Upson | 701 MW | 312 GWh | 5% | 2000 |
| AL Sandersville LLC | Natural gas | Washington | 692 MW | 326 GWh | 5% | 2002 |
| Richard B Russell | Storage | Elbert | 628 MW | 257 GWh | – | 1985 |
| Bobby C Smith Jr Energy Facility | Natural gas | Effingham | 597 MW | 3.2 TWh | 61% | 2003 |
| Wansley Unit 9 | Natural gas | Heard | 594 MW | 2.2 TWh | 42% | 2004 |
| Sewell Creek Energy | Natural gas | Polk | 570 MW | 416 GWh | 8% | 2000 |
| McManus | Oil | Glynn | 560 MW | 19 GWh | 0% | 1964 |
| Chattahoochee Energy Facility | Natural gas | Heard | 540 MW | 3.7 TWh | 78% | 2003 |
| McGrau Ford Battery Storage Facility | Storage | Cherokee | 530 MW | – | – | 2026 |
| Carters | Hydro | Murray | 500 MW | 30 GWh | 1% | 1975 |
| Hawk Road Facility | Natural gas | Heard | 495 MW | 722 GWh | 17% | 2001 |
| Walton County Energy Facility | Natural gas | Walton | 494 MW | 354 GWh | 8% | 2001 |
| Hartwell Lake | Hydro | Hart | 420 MW | 344 GWh | 9% | 1962 |
| Doyle Energy Facility | Natural gas | Walton | 409 MW | 27 GWh | 1% | 2000 |
| MPC Generating | Natural gas | Walton | 386 MW | 128 GWh | 4% | 2000 |
| Hartwell Energy Facility | Natural gas | Hart | 360 MW | 97 GWh | 3% | 1994 |
| Mid-Georgia Cogeneration Facility | Natural gas | Houston | 323 MW | 179 GWh | 6% | 1997 |
| Wallace Dam | Storage | Hancock | 321 MW | 40 GWh | – | 1979 |
| Wilson | Oil | Burke | 318 MW | 6.3 GWh | 0% | 1972 |
| Wadley Solar | Solar | Jefferson | 260 MW | 628 GWh | – | 2025 |
| Robins Air Force Base Solar | Solar | Bibb | 256 MW | 207 GWh | – | 2021 |
| Cool Springs Solar (Hybrid) | Solar | Decatur | 253 MW | 514 GWh | 23% | 2021 |
| SR Toombs, LLC | Solar | Montgomery | 250 MW | 560 GWh | – | 2025 |
| Smarr Energy Center | Natural gas | Monroe | 242 MW | 149 GWh | 7% | 1999 |
| Hickory Park Solar Hybrid | Solar | Mitchell | 236 MW | 431 GWh | 21% | 2022 |
| Twiggs Solar | Solar | Twiggs | 204 MW | 367 GWh | 21% | 2020 |
| Decatur Solar | Solar | Decatur | 200 MW | 480 GWh | 27% | 2024 |
| Robins | Oil | Houston | 184 MW | 4.6 GWh | 0% | 1995 |
| Camilla Solar Energy Project | Solar | Mitchell | 171 MW | 358 GWh | 24% | 2020 |
| Walter F George | Hydro | Clay | 168 MW | 341 GWh | 23% | 1963 |
| SR DeSoto I, LLC | Solar | Lee | 165 MW | 308 GWh | 21% | 2022 |
| Quitman Solar | Solar | Brooks | 150 MW | 320 GWh | 24% | 2019 |
| Quitman II Solar | Solar | Brooks | 150 MW | 314 GWh | 24% | 2021 |
| Washington County Solar | Solar | Washington | 150 MW | 312 GWh | 24% | 2024 |
| Taylor County Solar | Solar | Taylor | 148 MW | 257 GWh | 20% | 2016 |
| Savannah River Mill | Oil | Effingham | 140 MW | 135 GWh | 11% | 1986 |
| Timberland Solar | Solar | Oglethorpe | 140 MW | 41 GWh | – | 2025 |
| Buford | Hydro | Forsyth | 131 MW | 143 GWh | 12% | 2003 |
| Baconton Power Plant | Natural gas | Mitchell | 121 MW | 78 GWh | 7% | 2000 |
| Dougherty County Solar, LLC | Solar | Dougherty | 120 MW | 268 GWh | 26% | 2019 |
| SR Snipesville II | Solar | Jeff Davis | 107 MW | 250 GWh | 27% | 2021 |
| SR Snipesville III | Solar | Jeff Davis | 107 MW | 256 GWh | 27% | 2023 |
| SR Clay, LLC | Solar | Clay | 106 MW | 220 GWh | 24% | 2022 |
| Butler Solar Project 103 | Solar | Taylor | 104 MW | 224 GWh | 25% | 2016 |
| SR Arlington II | Solar | Early | 103 MW | 229 GWh | 26% | 2019 |
| White Pine Solar, LLC | Solar | Taylor | 101 MW | 188 GWh | 21% | 2016 |
| SR Lumpkin | Solar | Stewart | 100 MW | 235 GWh | 27% | 2021 |
| Sowega Power | Natural gas | Mitchell | 100 MW | 29 GWh | 3% | 1999 |
| Moody Air Force Base Solar | Solar | Lowndes | 99 MW | 84 GWh | – | 2020 |
| Allatoona | Hydro | Bartow | 87 MW | 111 GWh | 15% | 1950 |
| Snipesville | Solar | Jeff Davis | 86 MW | 207 GWh | 28% | 2020 |
| Clearwater Paper Corporation - Augusta | Biomass | Richmond | 85 MW | – | – | 1960 |
| WestRock Southeast, LLC. | Biomass | Laurens | 82 MW | 187 GWh | 26% | 1989 |
| Walton Bainbridge Power Facility | Oil | Decatur | 80 MW | 0.0 GWh | – | 2000 |
| Decatur Parkway Solar Project, LLC | Solar | Decatur | 80 MW | 173 GWh | 25% | 2015 |
| Lancaster Solar GA | Solar | Randolph | 80 MW | 183 GWh | 26% | 2021 |
| Blackwater Solar | Solar | Ware | 80 MW | 189 GWh | 27% | 2024 |
| SR Ailey | Solar | Montgomery | 80 MW | 191 GWh | 27% | 2024 |
| Bulldog Solar LLC | Solar | Warren | 80 MW | 171 GWh | 24% | 2023 |
| CPV Stagecoach Solar | Solar | Macon | 80 MW | 170 GWh | 24% | 2024 |
| Pineview Solar, LLC | Solar | Wilcox | 80 MW | – | – | 2026 |
| Flint River Operations | Biomass | Macon | 77 MW | 440 GWh | 65% | 1980 |
| White Oak Solar, LLC | Solar | Burke | 77 MW | 140 GWh | 21% | 2016 |
| SR Terrell | Solar | Terrell | 74 MW | 173 GWh | 27% | 2020 |
| West Point (GA) | Hydro | Troup | 73 MW | 159 GWh | 25% | 1975 |
| Port Wentworth Mill | Biomass | Chatham | 72 MW | 449 GWh | 71% | 1991 |
| Brunswick Cellulose | Biomass | Glynn | 72 MW | 217 GWh | 34% | 1954 |
| Tallulah Falls | Hydro | Habersham | 72 MW | 106 GWh | 17% | 1913 |
| International Paper Savanna Mill | Natural gas | Chatham | 71 MW | 467 GWh | 75% | 1981 |
| Inland Paperboard Packaging Rome | Biomass | Floyd | 70 MW | 403 GWh | 65% | 1954 |
| SR Cedar Springs, LLC | Solar | Early | 70 MW | 164 GWh | 27% | 2022 |
| Hobnail Solar | Solar | Burke | 70 MW | 163 GWh | 27% | 2023 |
| PCA-Valdosta Mill | Biomass | Lowndes | 70 MW | 311 GWh | 51% | 1954 |
| Jesup Plant | Biomass | Wayne | 70 MW | 464 GWh | 76% | 1954 |
| Graphic Packaging Intl Macon Mill | Biomass | Bibb | 69 MW | 342 GWh | 57% | 1948 |
| SR Perry | Solar | Houston | 68 MW | 157 GWh | 26% | 2021 |
| Mossy Branch Battery Facility | Storage | Talbot | 65 MW | -13.1 GWh | – | 2024 |
| SR DeSoto II | Solar | Lee | 65 MW | 153 GWh | 27% | 2023 |
| Oliver Dam | Hydro | Muscogee | 60 MW | 120 GWh | 23% | 1959 |
| Piedmont Green Power | Biomass | Lamar | 60 MW | 407 GWh | 78% | 2013 |
| SR DeSoto III | Solar | Lee | 60 MW | 135 GWh | 26% | 2023 |
| GRP Franklin Renewable Energy Facility | Biomass | Franklin | 58 MW | 385 GWh | 76% | 2019 |
| GRP Madison Renewable Energy Facility | Biomass | Madison | 58 MW | 423 GWh | 83% | 2019 |
| OE_GA3 | Solar | Mitchell | 58 MW | 124 GWh | 25% | 2020 |
| Albany Green Energy | Biomass | Dougherty | 55 MW | 106 GWh | 22% | 2017 |
Coming next
Planned projects
The largest generators reported as planned in Georgia, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Pepper Hammock Solar and Storage | Solar | Wayne | 1.2 GW | 2029 |
| Pepper Hammock Solar and Storage | Solar | Wayne | 900 MW | 2029 |
| Yates | Natural gas | Coweta | 483 MW | 2027 |
| Yates | Natural gas | Coweta | 483 MW | 2027 |
| Yates | Natural gas | Coweta | 483 MW | 2027 |
| Smarr Combined Cycle Energy Facility | Natural gas | Monroe | 459 MW | 2029 |
| Pepper Hammock Solar and Storage | Storage | Wayne | 400 MW | 2029 |
| Smarr Combined Cycle Energy Facility | Natural gas | Monroe | 345 MW | 2029 |
| Talbot County Energy | Natural gas | Talbot | 262 MW | 2029 |
| Peach Wood Solar | Solar | Mitchell | 261 MW | 2030 |
| Rock House Solar | Solar | McDuffie | 250 MW | 2027 |
| Conez Solar, LLC | Solar | Emanuel | 150 MW | 2027 |
| Laurens Solar | Solar | Laurens | 150 MW | 2028 |
| Crossroads Solar - GA | Solar | Liberty | 150 MW | 2029 |
| SR Bacon II | Solar | Bacon | 115 MW | 2027 |
| SR Norwood | Solar | Warren | 107 MW | 2027 |
| SR Bacon III | Solar | Bacon | 100 MW | 2027 |
| SR Rochelle I | Solar | Wilcox | 90 MW | 2026 |
| SR Bacon | Solar | Bacon | 85 MW | 2026 |
| Alligator Creek Solar | Solar | Wheeler | 80 MW | 2026 |
| Drawhorn Solar | Solar | Hancock | 80 MW | 2027 |
| Cabokenze Energy Storage | Storage | Burke | 76 MW | 2027 |
| Hammond | Storage | Floyd | 58 MW | 2026 |
| Sandersville Solar | Solar | Washington | 50 MW | 2027 |
| SR Rochelle II | Solar | Wilcox | 50 MW | 2027 |
| Solar BESS Hybrid | Natural gas | Cobb | 2.0 MW | 2027 |
| Solar BESS Hybrid | Natural gas | Cobb | 2.0 MW | 2027 |
| Solar BESS Hybrid | Natural gas | Cobb | 2.0 MW | 2027 |
Shut down
Retired since 2010
The largest generators retired in Georgia since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| Wansley | Coal | 952 MW | 2022 |
| Wansley | Coal | 952 MW | 2022 |
| Scherer | Coal | 891 MW | 2022 |
| Hammond | Coal | 578 MW | 2019 |
| Harllee Branch | Coal | 544 MW | 2015 |
| Harllee Branch | Coal | 544 MW | 2015 |
| Harllee Branch | Coal | 359 MW | 2013 |
| Jack McDonough | Coal | 299 MW | 2012 |
| Jack McDonough | Coal | 299 MW | 2011 |
| Harllee Branch | Coal | 299 MW | 2015 |
| McIntosh | Coal | 178 MW | 2019 |
| Mitchell (GA) | Coal | 163 MW | 2016 |
| Yates | Coal | 156 MW | 2015 |
| Yates | Coal | 156 MW | 2015 |
| Kraft | Natural gas | 126 MW | 2015 |
| Hammond | Coal | 125 MW | 2019 |
| Hammond | Coal | 125 MW | 2019 |
| Hammond | Coal | 125 MW | 2019 |
| Yates | Coal | 123 MW | 2015 |
| Yates | Coal | 123 MW | 2015 |
| Yates | Coal | 123 MW | 2015 |
| Kraft | Coal | 104 MW | 2015 |
| McManus | Oil | 94 MW | 2015 |
| International Paper Savanna Mill | Biomass | 83 MW | 2025 |
| Baconton Power Plant | Natural gas | 61 MW | 2023 |
| Baconton Power Plant | Natural gas | 61 MW | 2023 |
| Kraft | Coal | 54 MW | 2015 |
| Wansley | Oil | 53 MW | 2022 |
| Georgia-Pacific Cedar Springs | Biomass | 51 MW | 2025 |
| McManus | Oil | 50 MW | 2015 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.