Solar power plant · Burke, GA
Hobnail Solar
Hobnail Solar is a 70 MW solar power plant in Burke County, Georgia, operated by Hobnail Solar, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 163 GWh, about what 13,000 average Georgia homes use in a year.
Hobnail Solar in context
Among the 154 solar plants in Georgia in the EIA's inventory, it is the 35th largest, about 1.2% of the state's 5.8 GW of solar capacity.
Burke County has 7 power plants of 1 MW or more with 5.2 GW in all; Hobnail Solar is 1% of that and the 2nd largest of 5 solar plants there.
Its capacity factor of 27% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Burke County goes 11 hours a year without power, the 62nd most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hobnail Solar (outlined) and other plants in Burke County, shaded. 33.262, -82.178.
Plant facts
- Operator
- Hobnail Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SOCO
- County
- Burke County, GA
- EIA plant ID
- 66026
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GA-03 | Solar Photovoltaic | 70 MW | 2023 | – |
Nearby
Other plants in Burke County
Questions
Hobnail Solar, answered
How much power does Hobnail Solar produce?
Hobnail Solar has 70 MW of capacity from one generator. In 2025 it generated 163 GWh, 27% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hobnail Solar power?
Its 2025 output of 163 GWh equals the yearly electricity use of about 13,000 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hobnail Solar?
Hobnail Solar is in Burke County, Georgia, at about 33.262°, -82.178°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Burke County goes 11 hours a year without power, the 62nd most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Hobnail Solar?
It is operated by Hobnail Solar, LLC (EIA sector: IPP Non-CHP), and it feeds Southern Company.
When did Hobnail Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.