Natural gas power plant · Murray, GA
Thomas A Smith Energy Facility
Thomas A Smith Energy Facility is a 1.2 GW natural gas power plant in Murray County, Georgia, operated by Oglethorpe Power Corporation. Its oldest generator still running came online in 2002. In 2025 it generated 8.3 TWh, about what 638,000 average Georgia homes use in a year.
Thomas A Smith Energy Facility in context
Among the 30 natural gas plants in Georgia in the EIA's inventory, it is the 4th largest, about 6.4% of the state's 19 GW of natural gas capacity.
Murray County has 4 power plants of 1 MW or more with 1.7 GW in all; Thomas A Smith Energy Facility is 70% of that.
Its capacity factor of 79% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Murray County goes 5.7 hours a year without power, the 106th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Thomas A Smith Energy Facility (outlined) and other plants in Murray County, shaded. 34.709, -84.918.
Plant facts
- Operator
- Oglethorpe Power Corporation
- Sector
- Electric Utility
- Grid operator
- SOCO
- County
- Murray County, GA
- EIA plant ID
- 55382
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1STG | Natural Gas Fired Combined Cycle | 302 MW | 2002 | – |
| 2STG | Natural Gas Fired Combined Cycle | 302 MW | 2002 | – |
| 1GT1 | Natural Gas Fired Combined Cycle | 147 MW | 2002 | – |
| 1GT2 | Natural Gas Fired Combined Cycle | 147 MW | 2002 | – |
| 2GT1 | Natural Gas Fired Combined Cycle | 147 MW | 2002 | – |
| 2GT2 | Natural Gas Fired Combined Cycle | 147 MW | 2002 | – |
Nearby
Other plants in Murray County
Questions
Thomas A Smith Energy Facility, answered
How much power does Thomas A Smith Energy Facility produce?
Thomas A Smith Energy Facility has 1.2 GW of capacity from 6 generators. In 2025 it generated 8.3 TWh, 79% of the most it could have made running flat out all year (its capacity factor).
How many homes does Thomas A Smith Energy Facility power?
Its 2025 output of 8.3 TWh equals the yearly electricity use of about 638,000 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Thomas A Smith Energy Facility?
Thomas A Smith Energy Facility is in Murray County, Georgia, at about 34.709°, -84.918°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Murray County goes 5.7 hours a year without power, the 106th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Thomas A Smith Energy Facility?
It is operated by Oglethorpe Power Corporation (EIA sector: Electric Utility), and it feeds Southern Company.
When did Thomas A Smith Energy Facility open?
Its oldest generator still running came online in 2002.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.