Solar power plant · Mitchell, GA
Hickory Park Solar Hybrid
Hickory Park Solar Hybrid is a 236 MW solar power plant in Mitchell County, Georgia, operated by RWE Americas, LLC. Its oldest generator still running came online in 2022. In 2025 it generated 431 GWh, about what 33,000 average Georgia homes use in a year.
Hickory Park Solar Hybrid in context
Among the 154 solar plants in Georgia in the EIA's inventory, it is the 5th largest, about 4.1% of the state's 5.8 GW of solar capacity.
Mitchell County has 6 power plants of 1 MW or more with 701 MW in all; Hickory Park Solar Hybrid is 34% of that and the largest of 4 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Mitchell County goes 8.9 hours a year without power, the 74th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Hickory Park Solar Hybrid (outlined) and other plants in Mitchell County, shaded. 31.270, -84.176.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SOCO
- County
- Mitchell County, GA
- EIA plant ID
- 63522
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HPRK | Solar Photovoltaic | 196 MW | 2022 | – |
| HPBAT | Batteries | 40 MW · 80 MWh | 2022 | – |
Nearby
Other plants in Mitchell County
Questions
Hickory Park Solar Hybrid, answered
How much power does Hickory Park Solar Hybrid produce?
Hickory Park Solar Hybrid has 236 MW of capacity from 2 generators. In 2025 it generated 431 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Hickory Park Solar Hybrid power?
Its 2025 output of 431 GWh equals the yearly electricity use of about 33,000 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Hickory Park Solar Hybrid?
Hickory Park Solar Hybrid is in Mitchell County, Georgia, at about 31.270°, -84.176°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Mitchell County goes 8.9 hours a year without power, the 74th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Hickory Park Solar Hybrid?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds Southern Company.
When did Hickory Park Solar Hybrid open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.