Hydro power plant · Columbia, GA

Stevens Creek

Stevens Creek is a 18 MW hydro power plant in Columbia County, Georgia, operated by Dominion Energy South Carolina, Inc. Its oldest generator still running came online in 1914. In 2025 it generated 66 GWh, about what 5,100 average Georgia homes use in a year.

Capacity18 MWNameplate, September 2026
Generated66 GWhIn 2025
Capacity factor43%Share of the most it could make, 2025
Generators8Oldest from 1914

Stevens Creek in context

Among the 27 hydro plants in Georgia in the EIA's inventory, it is the 14th largest, about 1.0% of the state's 1.8 GW of hydro capacity.

Columbia County has 3 power plants of 1 MW or more with 21 MW in all; Stevens Creek is 84% of that.

Its capacity factor of 43% in 2025 is higher than the 34% typical for hydro plants across the US.

The average electricity customer in Columbia County goes 23 hours a year without power, the 28th most of 156 counties in Georgia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

02040608010012020182019202020212022202320242025GWh 66
020406080100120201920212023202566

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Stevens Creek (outlined) and other plants in Columbia County, shaded. 33.563, -82.051.

Plant facts

Operator
Dominion Energy South Carolina, Inc
Sector
Electric Utility
Grid operator
SCEG
County
Columbia County, GA
EIA plant ID
736
Where Georgia's power comes from → Georgia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Conventional Hydroelectric 2.2 MW 1914 –
2 Conventional Hydroelectric 2.2 MW 1914 –
3 Conventional Hydroelectric 2.2 MW 1914 –
4 Conventional Hydroelectric 2.2 MW 1914 –
5 Conventional Hydroelectric 2.2 MW 1914 –
6 Conventional Hydroelectric 2.2 MW 1925 –
7 Conventional Hydroelectric 2.2 MW 1926 –
8 Conventional Hydroelectric 2.2 MW 1926 –

Nearby

Other plants in Columbia County

Columbia Substation · 2.0 MWColumbia Bryson · 1.4 MW

Questions

Stevens Creek, answered

How much power does Stevens Creek produce?

Stevens Creek has 18 MW of capacity from 8 generators. In 2025 it generated 66 GWh, 43% of the most it could have made running flat out all year (its capacity factor).

How many homes does Stevens Creek power?

Its 2025 output of 66 GWh equals the yearly electricity use of about 5,100 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Stevens Creek?

Stevens Creek is in Columbia County, Georgia, at about 33.563°, -82.051°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Columbia County goes 23 hours a year without power, the 28th most of 156 counties in Georgia. The county's page has the full outage record.

Who operates Stevens Creek?

It is operated by Dominion Energy South Carolina, Inc (EIA sector: Electric Utility), and it feeds balancing authority SCEG.

When did Stevens Creek open?

Its oldest generator still running came online in 1914.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.