Solar power plant · Peach, GA
Fort Valley State University Solar
Fort Valley State University Solar is a 11 MW solar power plant in Peach County, Georgia, operated by Georgia Power Co. Its oldest generator still running came online in 2022. In 2025 it generated 21 GWh, about what 1,600 average Georgia homes use in a year.
Fort Valley State University Solar in context
Among the 154 solar plants in Georgia in the EIA's inventory, it is the 63rd largest, about 0.2% of the state's 5.8 GW of solar capacity.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Peach County goes 2.6 hours a year without power, the 137th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Fort Valley State University Solar (outlined) and other plants in Peach County, shaded. 32.502, -83.883.
Plant facts
- Operator
- Georgia Power Co
- Sector
- Electric Utility
- Grid operator
- SOCO
- County
- Peach County, GA
- EIA plant ID
- 63062
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Solar Photovoltaic | 11 MW | 2022 | – |
Questions
Fort Valley State University Solar, answered
How much power does Fort Valley State University Solar produce?
Fort Valley State University Solar has 11 MW of capacity from one generator. In 2025 it generated 21 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Fort Valley State University Solar power?
Its 2025 output of 21 GWh equals the yearly electricity use of about 1,600 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Fort Valley State University Solar?
Fort Valley State University Solar is in Peach County, Georgia, at about 32.502°, -83.883°. The average electricity customer in Peach County goes 2.6 hours a year without power, the 137th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Fort Valley State University Solar?
It is operated by Georgia Power Co (EIA sector: Electric Utility), and it feeds Southern Company.
When did Fort Valley State University Solar open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.