Solar power plant · Glynn, GA
Solar Glynn
Solar Glynn is a 18 MW solar power plant in Glynn County, Georgia, operated by Cypress Creek Renewables. Its oldest generator still running came online in 2016. In 2025 it generated 30 GWh, about what 2,300 average Georgia homes use in a year.
Solar Glynn in context
Among the 154 solar plants in Georgia in the EIA's inventory, it is the 61st largest, about 0.3% of the state's 5.8 GW of solar capacity.
Glynn County has 3 power plants of 1 MW or more with 650 MW in all; Solar Glynn is 3% of that.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Glynn County goes 15 hours a year without power, the 47th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Solar Glynn (outlined) and other plants in Glynn County, shaded. 31.250, -81.433.
Plant facts
- Operator
- Cypress Creek Renewables
- Sector
- IPP Non-CHP
- Grid operator
- SOCO
- County
- Glynn County, GA
- EIA plant ID
- 60469
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| INV1 | Solar Photovoltaic | 18 MW | 2016 | – |
Nearby
Other plants in Glynn County
Questions
Solar Glynn, answered
How much power does Solar Glynn produce?
Solar Glynn has 18 MW of capacity from one generator. In 2025 it generated 30 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Solar Glynn power?
Its 2025 output of 30 GWh equals the yearly electricity use of about 2,300 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Solar Glynn?
Solar Glynn is in Glynn County, Georgia, at about 31.250°, -81.433°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Glynn County goes 15 hours a year without power, the 47th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Solar Glynn?
It is operated by Cypress Creek Renewables (EIA sector: IPP Non-CHP), and it feeds Southern Company.
When did Solar Glynn open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.