Walter F George is a 168 MW hydro power plant in Clay County, Georgia, operated by USCE-Mobile District. Its oldest generator still running came online in 1963. In 2025 it generated 341 GWh, about what 26,000 average Georgia homes use in a year.
Walter F George in context
Among the 27 hydro plants in Georgia in the EIA's inventory, it is the 3rd largest, about 9.3% of the state's 1.8 GW of hydro capacity.
Clay County has 2 power plants of 1 MW or more with 274 MW in all; Walter F George is 61% of that.
Its capacity factor of 23% in 2025 is lower than the 34% typical for hydro plants across the US.
The average electricity customer in Clay County goes 36 hours a year without power, the 5th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Walter F George (outlined) and other plants in Clay County, shaded. 31.625, -85.065.
Plant facts
- Operator
- USCE-Mobile District
- Sector
- Electric Utility
- Grid operator
- SOCO
- County
- Clay County, GA
- EIA plant ID
- 761
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Conventional Hydroelectric | 42 MW | 1963 | – |
| 2 | Conventional Hydroelectric | 42 MW | 1963 | – |
| 3 | Conventional Hydroelectric | 42 MW | 1963 | – |
| 4 | Conventional Hydroelectric | 42 MW | 1963 | – |
Nearby
Other plants in Clay County
Questions
Walter F George, answered
How much power does Walter F George produce?
Walter F George has 168 MW of capacity from 4 generators. In 2025 it generated 341 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Walter F George power?
Its 2025 output of 341 GWh equals the yearly electricity use of about 26,000 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Walter F George?
Walter F George is in Clay County, Georgia, at about 31.625°, -85.065°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Clay County goes 36 hours a year without power, the 5th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Walter F George?
It is operated by USCE-Mobile District (EIA sector: Electric Utility), and it feeds Southern Company.
When did Walter F George open?
Its oldest generator still running came online in 1963.