Biomass power plant · Wayne, GA
Jesup Plant
Jesup Plant is a 70 MW biomass power plant in Wayne County, Georgia, operated by Rayonier Advanced Materials. Its oldest generator still running came online in 1954. In 2025 it generated 464 GWh, about what 36,000 average Georgia homes use in a year.
Jesup Plant in context
Among the 46 other-fuel plants in Georgia in the EIA's inventory, it is the 13th largest, about 3.0% of the state's 2.3 GW of other-fuel capacity.
Wayne County has 2 power plants of 1 MW or more with 72 MW in all; Jesup Plant is 96% of that.
Its capacity factor of 76% in 2025 is higher than the 25% typical for biomass plants across the US.
The average electricity customer in Wayne County goes 18 hours a year without power, the 36th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Jesup Plant (outlined) and other plants in Wayne County, shaded. 31.659, -81.844.
Plant facts
- Operator
- Rayonier Advanced Materials
- Sector
- Industrial CHP
- Grid operator
- SOCO
- County
- Wayne County, GA
- EIA plant ID
- 10560
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN5 | Wood/Wood Waste Biomass | 30 MW | 1971 | – |
| GEN6 | Wood/Wood Waste Biomass | 27 MW | 1982 | – |
| GEN4 | Wood/Wood Waste Biomass | 7.5 MW | 1957 | – |
| GEN2 | Wood/Wood Waste Biomass | 5.0 MW | 1954 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| GEN3 | Wood/Wood Waste Biomass | 7.5 MW | 1957 | 2017 |
Nearby
Other plants in Wayne County
Questions
Jesup Plant, answered
How much power does Jesup Plant produce?
Jesup Plant has 70 MW of capacity from 4 generators. In 2025 it generated 464 GWh, 76% of the most it could have made running flat out all year (its capacity factor).
How many homes does Jesup Plant power?
Its 2025 output of 464 GWh equals the yearly electricity use of about 36,000 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Jesup Plant?
Jesup Plant is in Wayne County, Georgia, at about 31.659°, -81.844°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Wayne County goes 18 hours a year without power, the 36th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Jesup Plant?
It is operated by Rayonier Advanced Materials (EIA sector: Industrial CHP), and it feeds Southern Company.
When did Jesup Plant open?
Its oldest generator still running came online in 1954.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.