Solar power plant · Twiggs, GA

Richland Solar Center

Richland Solar Center is a 20 MW solar power plant in Twiggs County, Georgia, operated by Onward Energy. Its oldest generator still running came online in 2015. In 2025 it generated 37 GWh, about what 2,900 average Georgia homes use in a year.

Capacity20 MWNameplate, September 2026
Generated37 GWhIn 2025
Capacity factor21%Share of the most it could make, 2025
Generators1Oldest from 2015

Richland Solar Center in context

Among the 154 solar plants in Georgia in the EIA's inventory, it is the 56th largest, about 0.3% of the state's 5.8 GW of solar capacity.

Twiggs County has 3 power plants of 1 MW or more with 227 MW in all; Richland Solar Center is 9% of that and the 2nd largest of 2 solar plants there.

Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Twiggs County goes 5.8 hours a year without power, the 105th most of 156 counties in Georgia. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0102030405020182019202020212022202320242025GWh 37
01020304050201920212023202537

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Richland Solar Center (outlined) and other plants in Twiggs County, shaded. 32.638, -83.379.

Plant facts

Operator
Onward Energy
Sector
IPP Non-CHP
Grid operator
SEPA
County
Twiggs County, GA
EIA plant ID
59874
Where Georgia's power comes from → Georgia power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PV1 Solar Photovoltaic 20 MW 2015 –

Nearby

Other plants in Twiggs County

Twiggs Solar · 204 MWADS Renewable Energy-Wolf Creek LLC · 2.8 MW

Questions

Richland Solar Center, answered

How much power does Richland Solar Center produce?

Richland Solar Center has 20 MW of capacity from one generator. In 2025 it generated 37 GWh, 21% of the most it could have made running flat out all year (its capacity factor).

How many homes does Richland Solar Center power?

Its 2025 output of 37 GWh equals the yearly electricity use of about 2,900 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Richland Solar Center?

Richland Solar Center is in Twiggs County, Georgia, at about 32.638°, -83.379°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Twiggs County goes 5.8 hours a year without power, the 105th most of 156 counties in Georgia. The county's page has the full outage record.

Who operates Richland Solar Center?

It is operated by Onward Energy (EIA sector: IPP Non-CHP), and it feeds balancing authority SEPA.

When did Richland Solar Center open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.