Solar power plant · Twiggs, GA
Richland Solar Center
Richland Solar Center is a 20 MW solar power plant in Twiggs County, Georgia, operated by Onward Energy. Its oldest generator still running came online in 2015. In 2025 it generated 37 GWh, about what 2,900 average Georgia homes use in a year.
Richland Solar Center in context
Among the 154 solar plants in Georgia in the EIA's inventory, it is the 56th largest, about 0.3% of the state's 5.8 GW of solar capacity.
Twiggs County has 3 power plants of 1 MW or more with 227 MW in all; Richland Solar Center is 9% of that and the 2nd largest of 2 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Twiggs County goes 5.8 hours a year without power, the 105th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Richland Solar Center (outlined) and other plants in Twiggs County, shaded. 32.638, -83.379.
Plant facts
- Operator
- Onward Energy
- Sector
- IPP Non-CHP
- Grid operator
- SEPA
- County
- Twiggs County, GA
- EIA plant ID
- 59874
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 20 MW | 2015 | – |
Nearby
Other plants in Twiggs County
Questions
Richland Solar Center, answered
How much power does Richland Solar Center produce?
Richland Solar Center has 20 MW of capacity from one generator. In 2025 it generated 37 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Richland Solar Center power?
Its 2025 output of 37 GWh equals the yearly electricity use of about 2,900 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Richland Solar Center?
Richland Solar Center is in Twiggs County, Georgia, at about 32.638°, -83.379°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Twiggs County goes 5.8 hours a year without power, the 105th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Richland Solar Center?
It is operated by Onward Energy (EIA sector: IPP Non-CHP), and it feeds balancing authority SEPA.
When did Richland Solar Center open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.