Natural gas power plant · Chatham, GA
Imperial Savannah LP
Imperial Savannah LP is a 12 MW natural gas power plant in Chatham County, Georgia, operated by US Sugar Savannah Refinery, LLC. Its oldest generator still running came online in 1946. In 2025 it generated 54 GWh, about what 4,200 average Georgia homes use in a year.
Imperial Savannah LP in context
Among the 30 natural gas plants in Georgia in the EIA's inventory, it is the 28th largest, about 0.1% of the state's 19 GW of natural gas capacity.
Chatham County has 6 power plants of 1 MW or more with 166 MW in all; Imperial Savannah LP is 7% of that and the 2nd largest of 2 natural gas plants there.
Its capacity factor of 53% in 2025 is higher than the 23% typical for natural gas plants across the US.
The average electricity customer in Chatham County goes 12 hours a year without power, the 56th most of 156 counties in Georgia. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Imperial Savannah LP (outlined) and other plants in Chatham County, shaded. 32.144, -81.147.
Plant facts
- Operator
- US Sugar Savannah Refinery, LLC
- Sector
- Industrial CHP
- Grid operator
- SOCO
- County
- Chatham County, GA
- EIA plant ID
- 50146
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEND | Natural Gas Steam Turbine | 5.0 MW | 1985 | – |
| GENB | Natural Gas Steam Turbine | 3.0 MW | 1959 | – |
| GENA | Natural Gas Steam Turbine | 2.7 MW | 1948 | – |
| GENC | Natural Gas Steam Turbine | 1.0 MW | 1946 | – |
Nearby
Other plants in Chatham County
Questions
Imperial Savannah LP, answered
How much power does Imperial Savannah LP produce?
Imperial Savannah LP has 12 MW of capacity from 4 generators. In 2025 it generated 54 GWh, 53% of the most it could have made running flat out all year (its capacity factor).
How many homes does Imperial Savannah LP power?
Its 2025 output of 54 GWh equals the yearly electricity use of about 4,200 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Imperial Savannah LP?
Imperial Savannah LP is in Chatham County, Georgia, at about 32.144°, -81.147°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Chatham County goes 12 hours a year without power, the 56th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Imperial Savannah LP?
It is operated by US Sugar Savannah Refinery, LLC (EIA sector: Industrial CHP), and it feeds Southern Company.
When did Imperial Savannah LP open?
Its oldest generator still running came online in 1946.