Solar power plant · Oglethorpe, GA
Timberland Solar
Timberland Solar is a 140 MW solar power plant in Oglethorpe County, Georgia, operated by RWE Americas, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 41 GWh, about what 3,200 average Georgia homes use in a year.
Timberland Solar in context
Among the 154 solar plants in Georgia in the EIA's inventory, it is the 14th largest, about 2.4% of the state's 5.8 GW of solar capacity.
Oglethorpe County has 2 power plants of 1 MW or more with 178 MW in all; Timberland Solar is 79% of that and the largest of 2 solar plants there.
The average electricity customer in Oglethorpe County goes 8.8 hours a year without power, the 77th most of 156 counties in Georgia. The county's page has the full outage record.
Seasons
Month by month, 2025
Where it is
Timberland Solar (outlined) and other plants in Oglethorpe County, shaded. 33.964, -82.816.
Plant facts
- Operator
- RWE Americas, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SEPA
- County
- Oglethorpe County, GA
- EIA plant ID
- 65892
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TSPV | Solar Photovoltaic | 140 MW | 2025 | – |
Nearby
Other plants in Oglethorpe County
Questions
Timberland Solar, answered
How much power does Timberland Solar produce?
Timberland Solar has 140 MW of capacity from one generator. In 2025 it generated 41 GWh.
How many homes does Timberland Solar power?
Its 2025 output of 41 GWh equals the yearly electricity use of about 3,200 average Georgia homes (1,077 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Timberland Solar?
Timberland Solar is in Oglethorpe County, Georgia, at about 33.964°, -82.816°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Oglethorpe County goes 8.8 hours a year without power, the 77th most of 156 counties in Georgia. The county's page has the full outage record.
Who operates Timberland Solar?
It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority SEPA.
When did Timberland Solar open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average Georgia home's 1,077 kWh a month in 2025. Methodology.