Wind power plant · Archer, TX
Bobcat Bluff Wind Project LLC
Bobcat Bluff Wind Project LLC is a 161 MW wind power plant in Archer County, Texas, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2012. In 2025 it generated 485 GWh, about what 36,000 average Texas homes use in a year.
Bobcat Bluff Wind Project LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 138th largest, about 0.4% of the state's 45 GW of wind capacity.
Archer County has 2 power plants of 1 MW or more with 229 MW in all; Bobcat Bluff Wind Project LLC is 70% of that and the largest of 2 wind plants there.
Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Archer County goes 13 hours a year without power, the 98th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bobcat Bluff Wind Project LLC (outlined) and other plants in Archer County, shaded. 33.493, -98.582.
Plant facts
- Operator
- EDF Renewable Asset Holdings, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Archer County, TX
- EIA plant ID
- 57974
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 161 MW | 2012 | – |
Nearby
Other plants in Archer County
Questions
Bobcat Bluff Wind Project LLC, answered
How much power does Bobcat Bluff Wind Project LLC produce?
Bobcat Bluff Wind Project LLC has 161 MW of capacity from one generator. In 2025 it generated 485 GWh, 34% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bobcat Bluff Wind Project LLC power?
Its 2025 output of 485 GWh equals the yearly electricity use of about 36,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bobcat Bluff Wind Project LLC?
Bobcat Bluff Wind Project LLC is in Archer County, Texas, at about 33.493°, -98.582°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Archer County goes 13 hours a year without power, the 98th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Bobcat Bluff Wind Project LLC?
It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Bobcat Bluff Wind Project LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.