Wind power plant · Archer, TX

Bobcat Bluff Wind Project LLC

Bobcat Bluff Wind Project LLC is a 161 MW wind power plant in Archer County, Texas, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2012. In 2025 it generated 485 GWh, about what 36,000 average Texas homes use in a year.

Capacity161 MWNameplate, September 2026
Generated485 GWhIn 2025
Capacity factor34%Share of the most it could make, 2025
Generators1Oldest from 2012

Bobcat Bluff Wind Project LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 138th largest, about 0.4% of the state's 45 GW of wind capacity.

Archer County has 2 power plants of 1 MW or more with 229 MW in all; Bobcat Bluff Wind Project LLC is 70% of that and the largest of 2 wind plants there.

Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Archer County goes 13 hours a year without power, the 98th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 485
02004006008002019202120232025485

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bobcat Bluff Wind Project LLC (outlined) and other plants in Archer County, shaded. 33.493, -98.582.

Plant facts

Operator
EDF Renewable Asset Holdings, Inc.
Sector
IPP Non-CHP
Grid operator
ERCO
County
Archer County, TX
EIA plant ID
57974
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
GEN1 Onshore Wind Turbine 161 MW 2012 –

Nearby

Other plants in Archer County

Questions

Bobcat Bluff Wind Project LLC, answered

How much power does Bobcat Bluff Wind Project LLC produce?

Bobcat Bluff Wind Project LLC has 161 MW of capacity from one generator. In 2025 it generated 485 GWh, 34% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bobcat Bluff Wind Project LLC power?

Its 2025 output of 485 GWh equals the yearly electricity use of about 36,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bobcat Bluff Wind Project LLC?

Bobcat Bluff Wind Project LLC is in Archer County, Texas, at about 33.493°, -98.582°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Archer County goes 13 hours a year without power, the 98th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Bobcat Bluff Wind Project LLC?

It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Bobcat Bluff Wind Project LLC open?

Its oldest generator still running came online in 2012.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.