Wind power plant · Archer, TX
Windthorst-2
Windthorst-2 is a 68 MW wind power plant in Archer County, Texas, operated by EDF Renewable Asset Holdings, Inc.. Its oldest generator still running came online in 2014. In 2025 it generated 182 GWh, about what 14,000 average Texas homes use in a year.
Windthorst-2 in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 207th largest, about 0.2% of the state's 45 GW of wind capacity.
Archer County has 2 power plants of 1 MW or more with 229 MW in all; Windthorst-2 is 30% of that and the 2nd largest of 2 wind plants there.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Archer County goes 13 hours a year without power, the 98th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Windthorst-2 (outlined) and other plants in Archer County, shaded. 33.495, -98.500.
Plant facts
- Operator
- EDF Renewable Asset Holdings, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Archer County, TX
- EIA plant ID
- 59238
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WND2 | Onshore Wind Turbine | 68 MW | 2014 | – |
Nearby
Other plants in Archer County
Questions
Windthorst-2, answered
How much power does Windthorst-2 produce?
Windthorst-2 has 68 MW of capacity from one generator. In 2025 it generated 182 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Windthorst-2 power?
Its 2025 output of 182 GWh equals the yearly electricity use of about 14,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Windthorst-2?
Windthorst-2 is in Archer County, Texas, at about 33.495°, -98.500°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Archer County goes 13 hours a year without power, the 98th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Windthorst-2?
It is operated by EDF Renewable Asset Holdings, Inc. (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Windthorst-2 open?
Its oldest generator still running came online in 2014.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.