Storage power plant · Wood, OH
Bowling Green Energy Storage Project
Bowling Green Energy Storage Project is a 12 MW storage power plant in Wood County, Ohio, operated by VESI 21 LLC. Its oldest generator still running came online in 2023.
Bowling Green Energy Storage Project in context
Among the 4 storage plants in Ohio in the EIA's inventory, it is the largest, about 36% of the state's 33 MW of storage capacity.
Wood County has 8 power plants of 1 MW or more with 915 MW in all; Bowling Green Energy Storage Project is 1% of that.
The average electricity customer in Wood County goes 1.4 hours a year without power, the 87th most of 88 counties in Ohio. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923. Storage uses more energy charging than it returns, so its net figure is negative.
Where it is
Bowling Green Energy Storage Project (outlined) and other plants in Wood County, shaded. 41.383, -83.611.
Plant facts
- Operator
- VESI 21 LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Wood County, OH
- EIA plant ID
- 65951
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BG1 | Batteries | 12 MW · 12 MWh | 2023 | – |
Nearby
Other plants in Wood County
Questions
Bowling Green Energy Storage Project, answered
How much can Bowling Green Energy Storage Project store and deliver?
Bowling Green Energy Storage Project can deliver up to 12 MW and hold 12 MWh of energy, from one battery or storage system. Its net energy in 2025 was -2.3 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Bowling Green Energy Storage Project?
Bowling Green Energy Storage Project is in Wood County, Ohio, at about 41.383°, -83.611°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Wood County goes 1.4 hours a year without power, the 87th most of 88 counties in Ohio. The county's page has the full outage record.
Who operates Bowling Green Energy Storage Project?
It is operated by VESI 21 LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Bowling Green Energy Storage Project open?
Its oldest generator still running came online in 2023.