Solar power plant · Hill, TX

BPL Files Solar

BPL Files Solar is a 158 MW solar power plant in Hill County, Texas, operated by BPL Files Solar LLC. Its oldest generator still running came online in 2023. In 2025 it generated 225 GWh, about what 17,000 average Texas homes use in a year.

Capacity158 MWNameplate, September 2026
Generated225 GWhIn 2025
Capacity factor16%Share of the most it could make, 2025
Generators1Oldest from 2023

BPL Files Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 107th largest, about 0.4% of the state's 37 GW of solar capacity.

Hill County has 10 power plants of 1 MW or more with 1.7 GW in all; BPL Files Solar is 10% of that and the 3rd largest of 8 solar plants there.

Its capacity factor of 16% in 2025 is lower than the 20% typical for solar plants across the US.

The average electricity customer in Hill County goes 8.5 hours a year without power, the 134th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

0100200300400202320242025GWh 225
0100200300400202320242025225

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

BPL Files Solar (outlined) and other plants in Hill County, shaded. 32.184, -97.071.

Plant facts

Operator
BPL Files Solar LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Hill County, TX
EIA plant ID
66324
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
FILES Solar Photovoltaic 158 MW 2023 –

Questions

BPL Files Solar, answered

How much power does BPL Files Solar produce?

BPL Files Solar has 158 MW of capacity from one generator. In 2025 it generated 225 GWh, 16% of the most it could have made running flat out all year (its capacity factor).

How many homes does BPL Files Solar power?

Its 2025 output of 225 GWh equals the yearly electricity use of about 17,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is BPL Files Solar?

BPL Files Solar is in Hill County, Texas, at about 32.184°, -97.071°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Hill County goes 8.5 hours a year without power, the 134th most of 240 counties in Texas. The county's page has the full outage record.

Who operates BPL Files Solar?

It is operated by BPL Files Solar LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did BPL Files Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.