Solar power plant · Hill, TX

Pitts Dudik Solar

Pitts Dudik Solar is a 50 MW solar power plant in Hill County, Texas, operated by Elawan Pitts Dudik Solar, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 102 GWh, about what 7,600 average Texas homes use in a year.

Capacity50 MWNameplate, September 2026
Generated102 GWhIn 2025
Capacity factor23%Share of the most it could make, 2025
Generators1Oldest from 2023

Pitts Dudik Solar in context

Among the 250 solar plants in Texas in the EIA's inventory, it is the 165th largest, about 0.1% of the state's 37 GW of solar capacity.

Hill County has 10 power plants of 1 MW or more with 1.7 GW in all; Pitts Dudik Solar is 3% of that and the 7th largest of 8 solar plants there.

Its capacity factor of 23% in 2025 is higher than the 20% typical for solar plants across the US.

The average electricity customer in Hill County goes 8.5 hours a year without power, the 134th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020406080100120202320242025GWh 102
020406080100120202320242025102

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Pitts Dudik Solar (outlined) and other plants in Hill County, shaded. 31.893, -96.875.

Plant facts

Operator
Elawan Pitts Dudik Solar, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Hill County, TX
EIA plant ID
67024
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
PTSDK Solar Photovoltaic 50 MW 2023 –

Questions

Pitts Dudik Solar, answered

How much power does Pitts Dudik Solar produce?

Pitts Dudik Solar has 50 MW of capacity from one generator. In 2025 it generated 102 GWh, 23% of the most it could have made running flat out all year (its capacity factor).

How many homes does Pitts Dudik Solar power?

Its 2025 output of 102 GWh equals the yearly electricity use of about 7,600 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Pitts Dudik Solar?

Pitts Dudik Solar is in Hill County, Texas, at about 31.893°, -96.875°. It is one of 10 power plants of 1 MW or more in the county. The average electricity customer in Hill County goes 8.5 hours a year without power, the 134th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Pitts Dudik Solar?

It is operated by Elawan Pitts Dudik Solar, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Pitts Dudik Solar open?

Its oldest generator still running came online in 2023.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.