Natural gas power plant · Suffolk, NY
Brentwood
Brentwood is a 47 MW natural gas power plant in Suffolk County, New York, operated by New York Power Authority. Its oldest generator still running came online in 2001. In 2025 it generated 41 GWh, about what 5,900 average New York homes use in a year.
Brentwood in context
Among the 103 natural gas plants in New York in the EIA's inventory, it is the 58th largest, about 0.2% of the state's 24 GW of natural gas capacity.
Suffolk County has 57 power plants of 1 MW or more with 4.4 GW in all; Brentwood is 1% of that and the 7th largest of 13 natural gas plants there.
Its capacity factor of 10% in 2025 is lower than the 23% typical for natural gas plants across the US.
The average electricity customer in Suffolk County goes 4.5 hours a year without power, the 43rd most of 62 counties in New York. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brentwood (outlined) and other plants in Suffolk County, shaded. 40.787, -73.293.
Plant facts
- Operator
- New York Power Authority
- Sector
- Electric Utility
- Grid operator
- NYIS
- County
- Suffolk County, NY
- EIA plant ID
- 7912
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | 47 MW | 2001 | – |
Questions
Brentwood, answered
How much power does Brentwood produce?
Brentwood has 47 MW of capacity from one generator. In 2025 it generated 41 GWh, 10% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brentwood power?
Its 2025 output of 41 GWh equals the yearly electricity use of about 5,900 average New York homes (586 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brentwood?
Brentwood is in Suffolk County, New York, at about 40.787°, -73.293°. It is one of 57 power plants of 1 MW or more in the county. The average electricity customer in Suffolk County goes 4.5 hours a year without power, the 43rd most of 62 counties in New York. The county's page has the full outage record.
Who operates Brentwood?
It is operated by New York Power Authority (EIA sector: Electric Utility), and it feeds the New York ISO.
When did Brentwood open?
Its oldest generator still running came online in 2001.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average New York home's 586 kWh a month in 2025. Methodology.