Wind power plant · Kit Carson, CO
Bronco Plains Wind II, LLC
Bronco Plains Wind II, LLC is a 200 MW wind power plant in Kit Carson County, Colorado, operated by Bronco Plains Wind II, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 669 GWh, about what 85,000 average Colorado homes use in a year.
Bronco Plains Wind II, LLC in context
Among the 34 wind plants in Colorado in the EIA's inventory, it is the 14th largest, about 3.4% of the state's 5.9 GW of wind capacity.
Kit Carson County has 7 power plants of 1 MW or more with 1.4 GW in all; Bronco Plains Wind II, LLC is 14% of that and the 3rd largest of 6 wind plants there.
Its capacity factor of 38% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Kit Carson County goes 12 hours a year without power, the 5th most of 39 counties in Colorado. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bronco Plains Wind II, LLC (outlined) and other plants in Kit Carson County, shaded. 39.184, -102.970.
Plant facts
- Operator
- Bronco Plains Wind II, LLC
- Sector
- IPP Non-CHP
- Grid operator
- PSCO
- County
- Kit Carson County, CO
- EIA plant ID
- 66014
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WBOPT | Onshore Wind Turbine | 200 MW | 2023 | – |
Questions
Bronco Plains Wind II, LLC, answered
How much power does Bronco Plains Wind II, LLC produce?
Bronco Plains Wind II, LLC has 200 MW of capacity from one generator. In 2025 it generated 669 GWh, 38% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bronco Plains Wind II, LLC power?
Its 2025 output of 669 GWh equals the yearly electricity use of about 85,000 average Colorado homes (658 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bronco Plains Wind II, LLC?
Bronco Plains Wind II, LLC is in Kit Carson County, Colorado, at about 39.184°, -102.970°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Kit Carson County goes 12 hours a year without power, the 5th most of 39 counties in Colorado. The county's page has the full outage record.
Who operates Bronco Plains Wind II, LLC?
It is operated by Bronco Plains Wind II, LLC (EIA sector: IPP Non-CHP), and it feeds Public Service Company of Colorado.
When did Bronco Plains Wind II, LLC open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Colorado home's 658 kWh a month in 2025. Methodology.