Wind power plant · Willacy, TX

Bruennings Breeze Wind Farm

Bruennings Breeze Wind Farm is a 228 MW wind power plant in Willacy County, Texas, operated by RWE Americas, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 525 GWh, about what 39,000 average Texas homes use in a year.

Capacity228 MWNameplate, September 2026
Generated525 GWhIn 2025
Capacity factor26%Share of the most it could make, 2025
Generators1Oldest from 2017

Bruennings Breeze Wind Farm in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 67th largest, about 0.5% of the state's 45 GW of wind capacity.

Willacy County has 6 power plants of 1 MW or more with 1.4 GW in all; Bruennings Breeze Wind Farm is 16% of that and the 4th largest of 6 wind plants there.

Its capacity factor of 26% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Willacy County goes 14 hours a year without power, the 83rd most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060080020182019202020212022202320242025GWh 525
02004006008002019202120232025525

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Bruennings Breeze Wind Farm (outlined) and other plants in Willacy County, shaded. 26.522, -97.691.

Plant facts

Operator
RWE Americas, LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Willacy County, TX
EIA plant ID
59066
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
MVII Onshore Wind Turbine 228 MW 2017 –

Questions

Bruennings Breeze Wind Farm, answered

How much power does Bruennings Breeze Wind Farm produce?

Bruennings Breeze Wind Farm has 228 MW of capacity from one generator. In 2025 it generated 525 GWh, 26% of the most it could have made running flat out all year (its capacity factor).

How many homes does Bruennings Breeze Wind Farm power?

Its 2025 output of 525 GWh equals the yearly electricity use of about 39,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Bruennings Breeze Wind Farm?

Bruennings Breeze Wind Farm is in Willacy County, Texas, at about 26.522°, -97.691°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Willacy County goes 14 hours a year without power, the 83rd most of 240 counties in Texas. The county's page has the full outage record.

Who operates Bruennings Breeze Wind Farm?

It is operated by RWE Americas, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Bruennings Breeze Wind Farm open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.