Wind power plant · Willacy, TX
Las Majadas Wind Farm
Las Majadas Wind Farm is a 273 MW wind power plant in Willacy County, Texas, operated by Las Majadas Wind Farm, LLC. Its oldest generator still running came online in 2021. In 2025 it generated 851 GWh, about what 64,000 average Texas homes use in a year.
Las Majadas Wind Farm in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 42nd largest, about 0.6% of the state's 45 GW of wind capacity.
Willacy County has 6 power plants of 1 MW or more with 1.4 GW in all; Las Majadas Wind Farm is 19% of that and the 2nd largest of 6 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Willacy County goes 14 hours a year without power, the 83rd most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Las Majadas Wind Farm (outlined) and other plants in Willacy County, shaded. 26.365, -97.545.
Plant facts
- Operator
- Las Majadas Wind Farm, LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Willacy County, TX
- EIA plant ID
- 63739
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| LMAJ | Onshore Wind Turbine | 273 MW | 2021 | – |
Questions
Las Majadas Wind Farm, answered
How much power does Las Majadas Wind Farm produce?
Las Majadas Wind Farm has 273 MW of capacity from one generator. In 2025 it generated 851 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Las Majadas Wind Farm power?
Its 2025 output of 851 GWh equals the yearly electricity use of about 64,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Las Majadas Wind Farm?
Las Majadas Wind Farm is in Willacy County, Texas, at about 26.365°, -97.545°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Willacy County goes 14 hours a year without power, the 83rd most of 240 counties in Texas. The county's page has the full outage record.
Who operates Las Majadas Wind Farm?
It is operated by Las Majadas Wind Farm, LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Las Majadas Wind Farm open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.